Top-rated asphalt driveway pros.

Best asphalt driveway pros near Otterbein, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Otterbein, IN?

Select your specific project to find the pro for you.

TRUSTED BY OTTERBEIN, IN HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon10
    Verified asphalt driveway services reviews

Top-Rated Asphalt driveway pros in Otterbein - Updated Nov 2026

B & W Contractors, Inc.
4.8(
25
)
Asphalt SealingAsphalt Paving - InstallAsphalt Paving - Repair or Patch+1 more

Serving Otterbein, IN and surrounding areas

Approved

In business since 2000

Free estimates

Credit card accepted

"Awesome, awesome, awesome!!! Very wonderful family owned business that delivered everything they promised and more. Bill and Gina are super to work wilth. I could not be happier with how my newly paved driveway turned out. It was a project that was on my radar for years and I feel like I was fortunate in finding the perfect fit with B&W paving. They just recently sealcoated the driveway too and did an excellent job!"
Response time1 day
25 neighbors recently requested a quote
Recommended by82%of homeowners
Avatar for Adam Lerma
Adam Lerma
New to Angi
Brick and Stone Driveways & Floors - Install

Serving Otterbein, IN and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I recently moved from the state of Florida to Indiana in 2024, I've been doing masonry work for a little over 6 years now and the previous work I did before that I was a carpenter for 8 years a roofer for 6 years you can say I am a jack of all trades I love the work that I do and I'm hoping I will have the opportunity to work with some you lovely people of Indiana. I live in the Lafayette area and will to serve its surrounding cities.

Avatar for OTL Excavating, LLC
OTL Excavating, LLC
4.9(
13
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGravel or Loose Fill Paving - Install, Spread or Scrape+1 more

Serving Otterbein, IN and surrounding areas

Free estimates

"We Highly recommend OTL excavating! Tyler was extremely responsive, he came out and gave us a quote on the spot. He stayed in contact with us while we waited for the weather to cooperate. He brought his team and they worked hard to get the job done! They grated our huge circle drive, added multiple parking spaces, rolled it out, had our patio framed and ready. They worked fast and efficiently and got both projects done in 1 day! We cannot wait to hire them again for some more ground work very soon!"
Excavating Project
Concrete - Pouring & Repair Project
Concrete - Pouring & Repair Project
Concrete - Pouring & Repair Project
Stone & Gravel Project

+40

Recommended by100%of homeowners
...
Showing 1-10 of 57
Asphalt Driveways FAQs, answered by experts

An asphalt overlay or top coat costs between $3 and $7 per square foot. For a standard, single-car driveway that’s 10 feet wide and 20 feet long, that’s a total of between $600 and $1,400. For a two-car driveway, you’re looking at a total of between $1,200 and $3,000.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

It’s best to weigh the pros and cons of each material and decide on your priorities for your driveway. Gravel won’t be an appropriate choice if your driveway experiences heavy traffic. You’ll find that you need to level and top it off regularly, which could make the material a much more expensive option.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

By grading and compacting the base soil, ensuring proper drainage and stability.

The Otterbein, IN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.