Top-rated floor cleaners and waxers.

Get matched with top floor cleaners and waxers in Colfax, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your floor cleaning and waxing project in Colfax, IN?

Select your specific project to find the pro for you.

Find Floor cleaners and waxers in Colfax

This Clean House Corp With Niecy Frazier
4.9(
24
)
Tile & Grout Cleaning - For Business

Serving Colfax, IN and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"The only issue I had was the late arrival without any warning.  They were scheduled at 8am so I was up early and waiting and finally got a call that they wouldn't be there till 10am.  Which was fine just would have been nice to know earlier.
They moved all the livingroom furniture and scrubbed all the walls, baseboards, baseboard heaters and blinds.  Washed windows, doors and lights.  Everything looked great when they were finished, even neighbors commented on it.  I will definitely have them back.
"
Recommended by95%of homeowners
Avatar for Marblelife of Indianapolis
Marblelife of Indianapolis
4.9(
35
)
Tile & Grout CleaningTile & Grout Cleaning - For Business

Serving Colfax, IN and surrounding areas

In business since 2019

Free estimates

Warranties offered

"We were on the fence about doing a major remodel in our master bathroom. The tile was old looking and a little worn but was only 5-7 years old I’m guessing. We decided after many quotes to “refresh” the bathroom and try to get another few years out of our current set up. We called Marble Life because they offer the grout sealing service that would help us tremendously. Michael was very responsive and came out to quote the project after giving me a rough estimate over the phone. We chose some colors to make the tile look clean and fresh and coordinate with the new paint. He repaired the cracked/missing grout, cleaned the shower floor and removed the old grout and caulk (about five different repairs had been made it seems), and then applied some seal at to the shower floor to help it last longer. The whole process took about 1.5/2 days for my floor, tub area decking, backsplash, and shower. It looks clean and brighter... now I don’t cringe when I take a shower. If you’ve never sealed your grout, I HIGHLY recommend it. It’s a breeze to clean and resists mold. He also used the appropriate grout caulk around the perimeter where the wall and floor meet so that it won’t crack again with the settling of the house. I am going to use them again to seal my floor in the kitchen, entry, and laundry room. They do excellent work, excellent clean up, and are very professional. I couldn’t be happier!"
Our Work
Our Work
Our Work
Our Work
Our Work

+42

Response time2 days
Recommended by100%of homeowners
Avatar for CDH Resurfacing Solutions
CDH Resurfacing Solutions
4.8(
60
)
Clean & Polish Flooring - For BusinessTile & Grout CleaningTile & Grout Cleaning - For Business

Serving Colfax, IN and surrounding areas

In business since 2010

Free estimates

Credit card accepted

"The young men arrived on time, worked professionally and efficiently. The entire process took 2-3 hours and they cleaned the area well. I was thrilled when I saw the finished product as the shower floor looks like new. I highly recommend CDH for all your resurfacing needs."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+65

Recommended by98%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Tile & Grout Cleaning - For Business

Serving Colfax, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Helping Handyman and Services
5.0(
5
)
Tile & Grout Cleaning - For Business

Serving Colfax, IN and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"I was extremely pleased with every step of the process of hiring and working with Helping Handyman! They were efficient and fair in giving me quotes for my services. When they arrived they worked efficiently and cleanly, and were all so friendly and professional. I am so glad to have found them and look forward to working with them in the future."
New roof
Roof cleaning
Flooring
Bathroom upgrade
Front door replacement

+44

Recommended by100%of homeowners
M & J Cleaning Services
New to Angi
Clean & Polish Flooring - For Business

Serving Colfax, IN and surrounding areas

In business since 1994

Free estimates

Emergency services offered

Enviro Clean Enterprises LLC is a central IN business, established in 2010. We attribute our success to our quality work, customer satisfaction and having accounts with stores such as Ace Hardware, Hobby Lobby, and Pamida. We use the most advanced equipment and environmentally safe chemicals to ensure excellent results. We strive to offer you the highest level of service at the best price, a combination has helped us build a great reputation. We provide valuable service to you by understanding your needs, helping you sort through your choices and recommending the appropriate service. The first step we take to understand a facility's requirements is to survey the operation: Ask questions, measure the square footage, address your concerns and enlighten you on ways to make improvements to the floors. All of our techs are trained on how to perform each task, and on important safety issues. Our goal is to clean each customer�s facility professionally and safely.\n

Alan's Floor Covering
4.5(
2
)
Tile & Grout Cleaning

Serving Colfax, IN and surrounding areas

In business since 1988

Free estimates

"Alan was prompt. Did an excellent job in replacing the carpet pad and reinstalling the carpet. His price was very reasonable. We had Alan to come back a few days later and tile a bathroom floor. We had concerns about replacing the tile around the edge of the floor/wall because of the age and the 2" tile vs the present day 4". Alan cut the 4" tiles down to 2" and installed them along side the new floor giving a very professional appearance, We are very pleased with Alan who is a very pleasant hard-working man and his professionalism. We will recommend him to friends and colleagues."
Recommended by100%of homeowners
Showing 1-10 of 46
Floor Cleaning and Waxing questions, answered by experts

Each flooring material has its own maintenance requirements and cleaning techniques. For example, hardwood floors may require occasional refinishing and specialized cleaning products, while vinyl and laminate are easy to clean with regular sweeping and mopping. Concrete and natural stone, on the other hand, may need periodic sealing to maintain their appearance and durability. Follow manufacturer recommendations and utilize appropriate cleaning methods to preserve the integrity of your chosen flooring material.

You should strip and wax hardwood floors every six months to two years. The actual length of time between stripping and waxing depends on the wear and tear that the floors see. Stripping and waxing floors can help repair hardwood floor damage and give the room a fresh look.

Yes, a magic eraser can remove candle wax. You can use it to remove all the candle wax from start to finish. Another option is to remove all large clumps with a dull knife and then pull out your magic eraser to finish the job. However, while the results can be impressive, a magic eraser shouldn’t be used on all surfaces since it can potentially damage them. If you try this method, test a small, hidden spot first and proceed cautiously.

Most experts agree that the best thing with which to clean epoxy floors is a diluted mixture of ammonia and warm water. You can also use mild dish soap diluted with warm water or a degreaser (such as Simple Green or Goof Off) diluted with warm water. Some soap-based cleaners can leave a haze. If you notice this, further dilute the mixture with water or use a different detergent that does not leave a film. You should never use harsh cleaning chemicals, any type of acidic compound (such as vinegar or citrus-based cleansers), or harsh scrubbers like steel wool or hard bristle brushes.

While it is not recommended, you can mix Bon Ami with vinegar for a more powerful cleaning mixture. However, you should avoid mixing other types of powder cleaners, such as Comet and Ajax, with vinegar or with each other, as the reaction often creates a toxic gas that’s dangerous to the human body.

The Colfax, IN homeowners’ guide to floor cleaning and waxing services

From average costs to expert advice, get all the answers you need to get your job done.