Top-rated deck repair pros.

Get matched with top deck repair pros in Berne, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your deck repair project in Berne, IN?

Select your specific project to find the pro for you.

Find Deck repair pros in Berne

Decks and Hardwood
4.5(
109
)
Deck or Porch - RepairDeck or Porch - Repair - For Business

Serving Berne, IN and surrounding areas

Approved

Super Service Award Winner

In business since 1988

Free estimates

Customers say: True professional

"James was able to save our deck that had been built with many errors several years ago by another contractor. Previous estimates from other contractors to fix the issues were to do a total tear off and start over. James came to look at our situation and determined it could be repaired and most of the original kept in place. He completed the work in a timely manner and now what was an unsafe deck is now going to be enjoyed for many years."
A restored wooden deck that is now composite.
 Before
 Big and useful.
 After
 Nice place to sit for awhile.

+14

Response time1 day
Response rate93%
62 neighbors recently requested a quote
Avatar for R&R ROOFING AND EXTERIORS LLC
R&R ROOFING AND EXTERIORS LLC
5.0(
9
)
Deck or Porch - Repair

Serving Berne, IN and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

At R&R Roofing & Exteriors, we believe homeowners deserve honest answers, quality workmanship, and a contractor they can trust. We’re a locally owned company serving Auburn, Fort Wayne, DeKalb County, Allen County, and surrounding communities.\nWe specialize in roof repairs and replacements, gutter repair and replacement, siding, windows, doors, and other exterior home improvements. Whether you have storm damage, an aging roof, a gutter problem, or simply want to improve the look and protection of your home, we're here to help.\nOur approach is simple: we inspect the problem, explain what we find, and give you straightforward options without high-pressure sales. We treat every home like it's our own and take pride in doing the job right.\nFrom the first conversation through completion, we focus on clear communication, dependable service, and quality workmanship.

Roof
Auburn roof
Roof replacement
27 neighbors recently requested a quote
Avatar for Untamed Contracting
Untamed Contracting
5.0(
13
)
Deck or Porch - Repair

Serving Berne, IN and surrounding areas

In business since 2024

Free estimates

"The project has been completed and looks great. Repairs were done as I requested and power washing made it look great! Would highly recommend this company. Was completed quickly and efficiently."
Response time2 hrs
Response rate98%
Avatar for Maximus General Contracting LLC
Maximus General Contracting LLC
4.4(
135
)
Deck or Porch - RepairDeck or Porch - Repair - For Business

Serving Berne, IN and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"The roof replacement was fine, but he didn't seal/paint the soffit. This caused a delay in the completion of the repairs I need to complete for an appraiser to sign off on the sale of the house, which caused a delay in the close date. Punctuality and professionalism.
"
Recommended by92%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Deck or Porch - RepairDeck or Porch - Repair - For Business

Serving Berne, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Showing 1-10 of 37
Deck Repair questions, answered by experts

How long it takes to install composite decking depends on the size of the decking material, the skills of the person installing the deck, the number of people helping, and how much prep work needs to be done before you can begin. Generally speaking, it takes anywhere from a few days to several weeks to build a composite deck.

The proper and most comfortable height for a deck stair riser, also called a step, is between four and seven inches. A height of seven inches is often considered ideal for a strain-free step that minimizes the risk of trips and falls. While it is possible to have risers up to 12 inches, this height can be challenging for children, pets, or individuals with mobility issues. For optimal safety and comfort, pair a seven-inch riser with a tread depth (or run) of at least 10 to 12 inches. Always check your local building codes, as they may have specific requirements that differ from these general recommendations.

Yes, designing builds to fit space constraints and meet functional needs.

It depends on the type of wood. The average cost to build a deck out of pressure-treated lumber is $15 to $25 per square foot, but more affordable varieties such as bamboo and cedar cost less at around $3 to $10 per square foot. However, when comparing the cost of vinyl decking versus wood decking, it’s important to also consider ongoing maintenance costs. For example, most woods require regular sealing to keep them protected against weather and rot.

Choices include wood, composite, and hardwoods, each with unique benefits.

The Berne, IN homeowners’ guide to deck repair services

From average costs to expert advice, get all the answers you need to get your job done.