Top-rated rototilling pros.

Get matched with top rototilling pros in Riverton, IL

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Riverton, IL?

Select your specific project to find the pro for you.

Find Rototilling pros in Riverton

Woodrum Brothers Inc.

No reviews yet

Woodrum Brothers Inc.

No reviews yet
70 years of experience

Every Project we undertake is a reflection of ourselves. Our know how, commitment to excellence and a dedication to innovation is what sets our company apart from the rest. Tradition. Integrity. Innovation. Efficiency. Trust. We provide all types of concrete and excavating services. From driveways, basements, sidewalks, sheds, and many more. We also provide excavating from site prep, sewer and water installation, drainage tile, farm drainage, ponds, trenching, and demolition. We also provide hauling from sand, gravel, fill dirt, black dirt, to debris removal. General Contractor, and site design also provided.

Every Project we undertake is a reflection of ourselves. Our know how, commitment to excellence and a dedication to innovation is what sets our company apart from the rest. Tradition. Integrity. Innovation. Efficiency. Trust. We provide all types of concrete and excavating services. From driveways, basements, sidewalks, sheds, and many more. We also provide excavating from site prep, sewer and water installation, drainage tile, farm drainage, ponds, trenching, and demolition. We also provide hauling from sand, gravel, fill dirt, black dirt, to debris removal. General Contractor, and site design also provided.



Rototilling questions, answered by experts

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Improved drainage, garden aesthetics, and protection from moisture damage.

Pros will assess your soil type, property geography, and rain patterns for optimal slope.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"