Top-rated rototilling pros.

Get matched with top rototilling pros in Mounds, IL

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Mounds, IL?

Select your specific project to find the pro for you.

Find Rototilling pros in Mounds


Rototilling questions, answered by experts

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

Typically 1-3 days, depending on property size and terrain condition.

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

If you notice small bumps on your lawn, you can flatten them by gently treading them down when the ground is wet. A lawn with larger lumps may need to be regraded by a professional to flatten it out and improve the overall drainage of the yard to prevent future lumps from forming.

Improved drainage, garden aesthetics, and protection from moisture damage.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.