Top-rated rototilling pros.

Get matched with top rototilling pros in Mounds, IL

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Mounds, IL?

Select your specific project to find the pro for you.

Find Rototilling pros in Mounds


Rototilling questions, answered by experts

DIY landscaping is possible, but professional services offer expertise in selecting appropriate plants and designing functional spaces that complement the natural environment and adhere to local regulations.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

You should exercise care when deciding how to landscape over a leach field for your septic system. You typically want lightweight materials that won’t damage the drain field’s perforated pipes. When adding plants to the area, select plants with shallow roots, such as grass or flower gardens. Trees with deep roots could damage the pipes in the field.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Mobile homes need releveling every so often to maintain their structural integrity. Most mobile home manufacturers recommend releveling every three to five years. To keep the quality of your mobile home up for years and to avoid deterioration over time, proper maintenance is key.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.