Top-rated rototilling pros.

Get matched with top rototilling pros in Cordova, IL

There are 0 highly-rated local rototilling pros.

Need a pro for your rototilling project in Cordova, IL?

Select your specific project to find the pro for you.

Find Rototilling pros in Cordova

Avatar for S&N Construction

S&N Construction

10664 E 100th Street
4.50(
4
)
Approved Pro

S&N Construction

10664 E 100th Street
4.50(
4
)
Approved Pro
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers
11 years of experience

S & N Construction is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 6years of experience serving Lynn Center, IL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!

"Very nice young man. I was disappointed that they did not put plastic down under the mulch but other than that they did a great job!!"

Betty M on June 2020

S & N Construction is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 6years of experience serving Lynn Center, IL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!

"Very nice young man. I was disappointed that they did not put plastic down under the mulch but other than that they did a great job!!"

Betty M on June 2020

Rototilling questions, answered by experts

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

For minor unevenness, you don't necessarily need to remove grass before leveling. You can apply a topdressing mixture to fill in low areas and even out the surface. However, for more significant unevenness or deep depressions, it might be necessary to temporarily remove the grass to ensure proper leveling and soil compaction. After filling and leveling, you can replace the grass or consider reseeding the area.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Yes, most services include grading for proper drainage. Confirm with your contractor.

The average cost to have rototilling done on your property is around $250, and most homeowners pay between $100 and $350. The total for your rototilling project will depend on the area you need tilled, the quality of the soil, how many roots and shrubs are in the area, and the accessibility of the area. Anything that increases the time to till your soil—like hard clay soil, small entrances to the area that require the use of smaller tools, and roots running through the ground—will all increase your costs.

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.