Top-rated solar panel pros.

Get matched with top solar panel pros in Centralia, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Centralia, IL?

Select your specific project to find the pro for you.

Find Solar panel pros in Centralia

Avatar for Solarize
Solarize
5.0(
10
)
Solar Panels For Electric System - RepairSolar Panel InstallSolar Panels For Electric System - Install - For Business+1 more

Serving Centralia, IL and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"Needed a sub panel and my entire garage wired(7 120 outlets, 2 240 outlets, and a floodlight put in). They showed up gave a quick run threw and they knocked it out Whole process was quick and easy. Great work at a great price! Would definitely recommend!"
72 neighbors recently requested a quote
Avatar for ETXSOLUTIONS
ETXSOLUTIONS
5.0(
3
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Centralia, IL and surrounding areas

Free estimates

Credit card accepted

"James with ETX Solutions, was very responsive to my inquiry and promptly answered every question I had. He is very knowledgeable about Solar and very professional. James explained all the tax credits and financial benefits of switching to Solar. I feel Solar energy is the smartest way to go, and James is the right person to get you set up and on your way!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Avatar for Rardin Plumbing Heating & A/C
Rardin Plumbing Heating & A/C
4.6(
11
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Centralia, IL and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Rardins has merged with Mattex Plumbing, but Oscar Rardin is still with them. Very professional, both over the phone and kept me updated through texts on the phone. Showed up as promised and was done within 3 hours. Only real difference was in how prices have inflated since 2014 (last time pump was replaced) $1400 vs $500 The pump accounted for over $1200 of that total. Oscar did a excellent job!"
Recommended by100%of homeowners
Showing 1-10 of 22
Solar Panels questions, answered by experts

If you’re deciding between a solar battery versus a generator for the best backup power solution, you can take a few factors into consideration. Solar batteries are quiet while generators can be quite loud. Generators have a lower up-front cost, but they require fuel and ongoing maintenance while solar batteries are more expensive but don’t have many ongoing costs.

For most U.S. homeowners, switching to solar energy is an excellent investment. A properly sized solar array can significantly reduce your electric bill, saving money on utilities every month. Most homeowners enjoy savings that cover the cost of their solar systems within 12 years and then turn a profit. Additionally, federal and state tax incentives are available that help make solar an even better and more profitable investment.

In most states, solar installers need to be licensed and insured as solar professionals, although some states don’t have specific requirements for installers. You can use our state licensing tool to check if an installer you’re considering hiring holds the proper licensing. No matter where you live, a member of your solar panel installation company must be a certified electrician to connect your panels to your home and the electric grid.

There are a few qualifying questions you should ask a local solar panel company before hiring them:

  • Will you handle permits for the installation?

  • Does your total price include the equipment and labor?

  • How long do you expect the installation process to take?

  • What kind of workmanship warranty do you include with your installations?

  • Who should I contact if I have a problem with my system after installation?

  • Do you install the panels or outsource the work to third parties?

  • Will you file for solar incentives for me?

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

The Centralia, IL homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.