Top-rated basement remodelers.

Best basement remodelers near Ketchum, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Ketchum, ID?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Ketchum - Updated Nov 2026

Avatar for Travers Tile
Travers Tile
5.0(
6
)
Basement - Remodel

Serving Ketchum, ID and surrounding areas

In business since 2020

Free estimates

"Ian does an amazing job. He remodeled two of my bathroom and was easy to work with and careful to make sure everything was done exactly the way I requested."
Wood-look tile flooring with tile baseboards and metal moulding.
Wheelchair Access Shower
Beautiful herring bone walls with a custom marble tub deck and bench inside the shower!
Custom Travers Tile made mosaic from tiles cut from real local stone made to the specifications of the homeowner
Custom built shelving

+49

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Ketchum, ID and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
D&R Construction and Remodeling
New to Angi
Basement - Remodel

Serving Ketchum, ID and surrounding areas

In business since 2000

Welcome to D&R Construction and Remodeling, proudly servicing Elba and the surrounding areas. Our goal is to complete your project to perfection. We look forward to building long-lasting relationships with the customers that we serve. We look forward to serving you. Call us today! You will not be disappointed. Please note: I charge a travel fee of $100 and an estimation fee of $250 due at the time of estimate arrival. Although you (The Client) may consider a job to be simple, it is never simple as per my services are required. When you (The Client) agree to allow me (Diamond Mills D&R Construction and Remodeling) to move forward to coming to the job site, you are agreeing to pay a total of $350 upon my arrival. Additional charges may be added to bill which are due at time of project completion. \n\nWe accept Venmo, Paypal, Cash App, Check, and Cash.\n\nm-f 8am-5pm weekends by appt only

Showing 1-10 of 17
Basement Remodel FAQs, answered by experts

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

The Ketchum, ID homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.