"I am extremely impressed with the quality of work provided by this Company for the installation of my windows. The team was Efficient, skilled and paid attention to details to ensure a flawless finish. The customer service was exceptional, and I felt well taken care of throughout the entire process. I would highly recommend them to anyone looking to upgrade their windows and doors."
"Amanda was really very good! At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it. It was very clear that she knew her business and she gave me several ideas that I had not even thought about. I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!
Hi, I'm Chance, I have been in the remodeling industry for 8 years doing everything from kitchen to bath remodels, small and big repairs, or full home transformations. We do everything to ensure that your house looks Picture Perfect!
Gibson Construction is a full service contractor with over 30 years of experience. We are on site every day to ensure quality workmanship and timely completion of every trade.
The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.
Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.
Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.
In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.
Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage.
The Bruneau, ID homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
Hiring a bad basement remodeler can wreak havoc on the look and longevity of your unfinished space. Here are red flags to look for as you vet basement contractors.