Top-rated basement remodelers.

Get matched with top basement remodelers in Venice, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Venice, FL?

Select your specific project to find the pro for you.

TRUSTED BY VENICE, FL HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon10
    Verified basement remodels reviews

Find Basement remodelers in Venice

Avatar for CER Design Build
CER Design Build
4.8(
21
)
Basement - Remodel

Serving Venice, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Bob Kontout
Bob Kontout
4.5(
144
)
Basement - Remodel

Serving Venice, FL and surrounding areas

In business since 1994

Free estimates

"Beautifully! I received good suggestions for choices on cabinetry and lighting and, where to look for the floor tile and lighting. I made my own decisions and the work was done efficiently and on time. I would not hesitate to recommend Residential Services to anyone looking to remodel a kitchen, baths and flooring and lighting upgrades."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by92%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)
Basement - Remodel

Serving Venice, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
Avatar for Joe Boyer Home Repair and Installations LLC
Joe Boyer Home Repair and Installations LLC
5.0(
13
)
Basement - Remodel

Serving Venice, FL and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"I HAVE USED JOE BOYER'S CO. ON NUMEROUS REMODEL PROJECTS. JOE'S CO. IS TOP SHELF FROM START TO FINISH. HIS WORK IS VERY PROFESSIONAL. HE IS GREAT TO WORK WITH. ALWAYS ON TIME AND RETURNS PHONE CALLS RIGHT AWAY. WHEN HE COMPLETES A PROJECT THE JOBSITE IS SPOTLESS. I USUALLY DON'T MAKE RECOMMENDATIONS. I KNOW JOE'S WORK ETHICS AND I HAVE NO PROBLEM GIVING JOE HIGH MARKS FOR HIS PROFESSIONALISM. UNFORTUNATELY, I MOVED ACROSS COUNTRY AND NO LONGER HAVE ACCESS TO JOE BOYER'S SERVICES."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Avatar for Omkal Construction, Inc.
Omkal Construction, Inc.
4.8(
61
)
Basement - Remodel

Serving Venice, FL and surrounding areas

In business since 2001

Free estimates

"Oleg and Omkal Construction did an amazing job on our remodel and repair work. Shortly after settling on our home we found major termite damage. Oleg and team removed the damaged joists, took down a wall and installed a new I-Beam giving them a an amazing open floor plan with which to do our remodel. Oleg is responsive, timely and does great work. I would not hesitate to use him again!"
Roberts rd
Roberts rd
Roberts rd
Roberts rd
Roberts rd

+74

Recommended by100%of homeowners
Avatar for KrispyKlean
KrispyKlean
5.0(
11
)
Basement - Remodel

Serving Venice, FL and surrounding areas

In business since 2020

Free estimates

Emergency services offered

Krispy Klean is a cleaning company striving to keep dirt and dust far away from homes! We are here to keep houses smelling good, looking neat & krispy klean. We provide you with great, professional service and make sure to ensure we have customers who want to come back. Thank you in advance for trying KrispyKlean!! Where our cleaning is mean and Klean. Call or click to schedule a FREE estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by100%of homeowners
...
Showing 1-10 of 53
Basement Remodel questions, answered by experts

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.

The Venice, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.