Top-rated basement remodelers.

Best basement remodelers near South Pasadena, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in South Pasadena, FL?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in South Pasadena - Updated Nov 2026

Avatar for Merinos Custom Construction LLC
Merinos Custom Construction LLC
5.0(
9
)
Basement - Remodel

Serving South Pasadena, FL and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"If there were six stars to choose from, that would be the rating I would give for the service provided. They were efficient, on time, and had a very professional and friendly personality, doing an amazing job repairing my ceiling. I will be using them for future handyman projects!"
1 neighbors recently requested a quote
Avatar for Martin Day Construction LLC
Martin Day Construction LLC
5.0(
2
)
Basement - Remodel

Serving South Pasadena, FL and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

We have a single mission: Complete Customer Satisfaction! We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience. \nYou will find us to be competitively priced with close attention to the details. \nOur reputation is based on service, safety, and quality, regardless of how large or small the job. \nWe look forward to building a lasting relationship and guarantee your satisfaction! \n

Bathroom Remodel
Response time1 day
Response rate100%
Avatar for CER Design Build
CER Design Build
4.8(
21
)
Basement - Remodel

Serving South Pasadena, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)
Basement - Remodel

Serving South Pasadena, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
Avatar for Southwest Florida Builders Group
Southwest Florida Builders Group
5.0(
5
)
Basement - Remodel

Serving South Pasadena, FL and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"The project went smooth and fast. They met all timeline markers and was amazing. The project came out beautiful. Their quality exceeded my expectations. I am really happy and will definitely be calling them back for the future."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Recommended by100%of homeowners
...
Showing 1-10 of 74
Basement Remodel FAQs, answered by experts

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The average cost of remodeling a basement is $30 to $75 per square foot. If your space is unfinished and looks like it may need more help, use the higher number when calculating your estimated basement remodeling costs. A good rule of thumb is to add an additional 20% to the top of your estimate to cover any “what if” situations.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

The South Pasadena, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.