Top-rated concrete wall service pros.

Best concrete wall service pros near Seffner, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete wall construction project in Seffner, FL?

Select your specific project to find the pro for you.

TRUSTED BY SEFFNER, FL HOMEOWNERS

  • Average homeowner rating star icon3.8
    Average homeowner rating
  • Verified reviews icon54
    Verified concrete wall construction reviews

Top-Rated Concrete wall service pros in Seffner - Updated Nov 2026

Avatar for Alpha Foundations
Alpha Foundations
4.2(
145
)
Poured Concrete Wall - Repair

Serving Seffner, FL and surrounding areas

Approved (Corporate)

In business since 2003

Free estimates

Warranties offered

"Ryan and Matt did an amazing job of concrete lifting of my driveway. They were very professional, friendly, and respectful. I'm glad I chose Alpha Foundations for my job."
Protect Your Concrete Before & After
Protect Your Concrete
Lift Your Uneven Concrete
Protect Your Concrete
Lift And Stabilize Your Concrete

+10

167 neighbors recently requested a quote
Recommended by71%of homeowners
Avatar for Chavez Construction Solutions
Chavez Construction Solutions
New to Angi
Poured Concrete Wall - Install

Serving Seffner, FL and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

I am starting a land clearing business with a passion for hard work, outdoor operations, and helping property owners transform their land. I specialize in clearing brush, trees, debris, and overgrown areas to prepare properties for development and improvement. My focus is on providing honest service, dependable results, and building long-term relationships with customers in my community.

...
Showing 1-10 of 142
Concrete Walls FAQs, answered by experts

Installation typically takes 1-2 weeks, depending on the wall’s size and site conditions.

The longevity of flood walls depends on how they were constructed, but most wood, gravel, and cement flood walls last 10 years. While aluminum flood walls may cost far more initially, they can be a good investment as they can last decades and will not be damaged by exposure to the elements.

Most of the time, you or your contractor will spray the concrete form and framework with a release agent or oil to prevent sticking. This is common practice with wood and steel forms. For insulated concrete forms, the styrofoam formwork often remains in place after construction, so you don’t need to treat it beforehand. Foam concrete forms made out of melamine also may not need treatment beforehand, as the material naturally won’t stick to the concrete after it’s cured.

Aim for a concrete thickness of at least 4 inches for the walls of your above-ground storm shelter and 3.0 to 3.5 cubic yards of concrete for the base of your storm shelter. If you’re concerned about the thickness of your concrete while building a storm shelter, get in touch with a professional storm shelter builder to make sure your work is up to code and safe. 

Concrete walls last anywhere from 30 to 100 years. In many cases, concrete walls will last longer with proper support and ongoing maintenance. Some concrete foundations, for example, could last up to two centuries when properly maintained. Toward the end of its life span, however, it's critical to have a structural engineer examine the concrete wall for potential signs of decay.

The Seffner, FL homeowners’ guide to concrete wall construction

From average costs to expert advice, get all the answers you need to get your job done.