Top-rated basement remodelers.

Get matched with top basement remodelers in Destin, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Destin, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Destin

Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Destin, FL and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for PB & K Construction and Land Management LLC.
PB & K Construction and Land Management LLC.
5.0(
2
)

Serving Destin, FL and surrounding areas

Emergency services offered

Credit card accepted

"PB&K did a great job for me by mulching trees and shrubs from my fence lines and relocating a large burn pile of trees from the front of my property to the rear. He is a hard worker that showed up on time and worked full days. I was very satisfied with the work and the price."
Path for survey
Tree service
Path for survey
Mulching
Path clearing

+13

Recommended by100%of homeowners
Avatar for Jack of All trades
Jack of All trades
5.0(
2
)

Serving Destin, FL and surrounding areas

Credit card accepted

"It was very good. They did a very good job. They were here when they said they were going to be here both times for the appointment and for the job. His price was reasonable. He stayed until the job was done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Recommended by100%of homeowners
Showing 1-10 of 38
Basement Remodel questions, answered by experts

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Destin, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.