Top-rated generator install pros.

Get matched with top generator install pros in Thompson, CT

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Thompson, CT?

Select your specific project to find the pro for you.

Find Generator install pros in Thompson

Avatar for R A Buckley & Son Electrical Contractors, LLC
R A Buckley & Son Electrical Contractors, LLC
4.8(
49
)
Fixed Generator - InstallGenerator - Install - For BusinessPortable Generator - Install

Serving Thompson, CT and surrounding areas

Approved

Super Service Award Winner

In business since 2000

Free estimates

Offers commercial services

"Highly recommend contacting them for electrical work! Responded quickly to come and give a quote for a generator hook up. Explained everything thoroughly and gave helpful suggestions as this was my first experience getting a generator to power the house. Very reasonable pricing. From first contact to getting it installed in under 2 weeks. Very happy!!"
Response time5 hrs
Response rate90%
2 neighbors recently requested a quote
Avatar for Electric Solutions Contracting
Electric Solutions Contracting
4.3(
59
)
Fixed Generator - InstallPortable Generator - Install

Serving Thompson, CT and surrounding areas

Approved

In business since 2014

Free estimates

Offers commercial services

"Kevin has been doing electrical work for us for about a decade, first upgrading the electrical ststem in our 1920s bungalow in Willimantic, and then coming out numerous times to update various elements in our historic home in Chaplin. He's great to work with, no- nonsense, thoughtful about creating safe solutions for our older house, including a generator installation. A nice person and a true professional."
12 neighbors recently requested a quote
Recommended by84%of homeowners
Deary Electric & Renovations
4.7(
33
)
Fixed Generator - InstallFixed Generator - Repair

Serving Thompson, CT and surrounding areas

Approved

In business since 2001

Emergency services offered

Credit card accepted

"I highly recommend Deary Electric. After finding them through Home Advisor, I spoke on the phone with Josh just a few minutes later. They arrived when he said and called ahead 30 minutes before he arrived. Once here, Josh and his partner were able to quickly figure out what the problem was and fixed it shortly thereafter. Cost was more than fair; money well spent. Will definitely call them for future work."
Additional Photos
Response time5 days
Response rate100%
9 neighbors recently requested a quote
Showing 1-10 of 45
Generator Install questions, answered by experts

Costs depend on generator type, labor, and additional wiring or transfer switch requirements.

If you’re deciding between a solar battery versus a generator for the best backup power solution, you can take a few factors into consideration. Solar batteries are quiet while generators can be quite loud. Generators have a lower up-front cost, but they require fuel and ongoing maintenance while solar batteries are more expensive but don’t have many ongoing costs.

Natural gas and electricity rates vary significantly based on location, and pricing can change over time, too. It’s possible that in locations where natural gas is particularly inexpensive, it will cost less than grid-based electricity will. However, you should also factor in the generator’s initial costs and maintenance needs, as well as its noise level and if it can comfortably power all your home appliances.

Here’s what you can run with different wattages and types of generators:

Portable generator:

  • 2,000 watts can handle a large appliance like a freezer or refrigerator, plus a few smaller items like phones or computer chargers. 

  • 4,000 watts will keep two large appliances operating and a few smaller devices.

  • 8,000 watts should power most essential appliances and other devices, including a sump pump, well pump, or your dishwasher.

Partial to whole-house generator:

  • 20,000 watts and above will make it seem like your home’s power is still on.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Thompson, CT homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.