Top-rated subcontractors.

Get matched with top subcontractors in Fraser, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Fraser, CO?

Select your specific project to find the pro for you.

TRUSTED BY FRASER, CO HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon182
    Verified subcontracting services reviews

Find Subcontractors in Fraser

Avatar for P.E.K. Construction
P.E.K. Construction
4.8(
9
)

Serving Fraser, CO and surrounding areas

Approved

In business since 1995

Free estimates

Warranties offered

"Brian and his crew took on a complete renovation project that involved framing, flooring, electrical, plumbing, heated floors, installations, tiling, dry walling, and finish work for a new addition and full bath and laundry conversion. They had skills in all areas, which meant there was not a need to coordinate and have schedule gaps when using subcontractors. Brian is an unflappable problem solver (and did!) and great to communicate with. Their work was professional and reasonably priced. I acted as general since there are some advantages for permitting a project like ours as a homeowner. I would use and recommend Brian again without hesitation."
Response time1 day
5 neighbors recently requested a quote
Recommended by88%of homeowners
Neumiller Electric
New to Angi

Serving Fraser, CO and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

My name is Robert Neumiller, I have lived in Loveland CO for the last 29 years.\nI have been a licensed electrician since 1998, my experience includes service work,\nall aspects of residential specializing in kitchen renovations, bathroom renovations, and additions. We also specialize in commercial electrical work including remodels and tenant finishes. I also have many years of experience in agriculture and light industrial electrical work. I received my Master license and Contractor license in 2017. I have one employee and all work performed will be done by the two of us. Our main focus is quality work performed in a timely manner. We mainly work along the front range from Ft Collins\nto Denver depending on the scope of work. All estimates are free and we are happy to help design/build if assistance is needed! No money is required up front to purchase material unless there's a special situation. Please give us the opportunity to help you with your electrical needs!

1 neighbors recently requested a quote
Showing 1-10 of 47
Subcontractors questions, answered by experts

British architect John Nash is credited with creating the Italianate style of architecture. The style was further popularized in the U.S. by landscape architect Andrew Jackson Downing and architect Calvert Vaux. The style spread across the U.S. due to Downing’s popular book on the style and the availability of plans and materials due to the mass production of the Industrial Revolution.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Fraser, CO homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.