Top-rated driveway sealcoating pros.

Best driveway sealcoating pros near Upper Lake, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Upper Lake, CA?

Select your specific project to find the pro for you.

Top-Rated Driveway sealcoating pros in Upper Lake - Updated Nov 2026

Avatar for Ocean Seven Builders
Ocean Seven Builders
4.6(
68
)
Asphalt SealingAsphalt Sealing- For Business

Serving Upper Lake, CA and surrounding areas

In business since 1994

Free estimates

Emergency services offered

"We had Ocean Seven Builders redo our roof after a small leak turned into a bigger problem. Ron was the one we dealt with, and he just felt easy to talk to from the start. No pressure, no upselling, just explained what made sense. The crew showed up when they said they would and worked pretty steadily through the job. What I noticed most was how clean they kept things?no nails or trash left around. The roof looks great and we?ve had zero issues since."
Additional Photos
Additional Photos
Additional Photos
Recommended by59%of homeowners
Avatar for Asphalt Aces
Asphalt Aces
4.4(
18
)
Asphalt SealingAsphalt Sealing- For Business

Serving Upper Lake, CA and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"Edward and his incredible team worked very hard to finished our driveway right away. My husband and I are very pleased with the final results. We thank Jim,Edward and his entire team for an incredible job done! Consuelo"
Asphalt install
Asphalt install
Chip seal
Chip seal
Chip seal

+9

Response time1 day
Response rate100%
Recommended by60%of homeowners
Avatar for Mega Power Electric, Inc
Mega Power Electric, Inc
5.0(
191
)
Asphalt SealingAsphalt Sealing- For Business

Serving Upper Lake, CA and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Mega Power was great! I hired them to go solar on my house and the solar analyst that came out was very helpful from day one. He was not just simply a sales guy he gave me his personal cell phone that I was able to call anytime if I had questions or wanted updates about my project.
My project was about 6 kW and consisted of 22 panels, each panel was 275 Watts. What I loved about these guys is that all the products they installed were American made products, warrantied for 25 years! Working with Jonathan (our sales guy) was another reason I chose to go with Mega Power. Every step of the way Jonathan was informative, and just professional from day 1. Price quotes with other companies were similar, so I simply chose the company that provided me the best service before signing anything."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+32

Recommended by100%of homeowners
Driveway Sealcoating FAQs, answered by experts

Depending on the product used, you should avoid using your driveway for 48 to 72 hours after sealing it. In general, water-based driveway sealers cure much faster compared to oil-based and solvent-based sealers. Some driveways are even ready in just four to five hours.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

In general, crack fillers last for about two years on average. That timeline can be shorter if you have extremely harsh winters or longer if you live in a mild climate. Luckily, this product is pretty affordable at the hardware store (about $10 to $30) and easy to DIY, so redoing it every few years shouldn’t be too much of a hassle.

To maintain your asphalt driveway, add a new coat of sealant every three to five years. Pricing varies, but you will pay about $0.08 to $0.50 per square foot from start to finish. You can also choose to add a fill-and-seal layer that includes a layer of aggregate to fortify a damaged top layer of asphalt.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Upper Lake, CA homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.