Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Raymond, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Raymond, CA?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Raymond

Avatar for S & S Pavement Protection
S & S Pavement Protection
5.0(
15
)
Asphalt Sealing

Serving Raymond, CA and surrounding areas

Approved

In business since 2019

Free estimates

Small jobs welcome

"Incredibly Beautiful crack-fill and reseal project completed on my very old driveway!! Watching the 2 of them work together was a delight! Very hard workers!! They are both very professional, friendly and super informative about the entire 2-day project! I could not be happier! I highly recommend S&S for any paving job!"
Asphalt Sealcoating & Crack Sealing
Asphalt Sealcoating & Crack Sealing
Asphalt Sealcoating & Crack Sealing
Asphalt Sealcoating & Crack Sealing
Asphalt Sealcoating & Crack Sealing

+5

Response time1 day
2 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Just Stamping Concrete
Just Stamping Concrete
5.0(
28
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Raymond, CA and surrounding areas

Approved

In business since 2007

Free estimates

Credit card accepted

"I recently hired Just Stamping Concrete for a landscaping project, and I must say that I was blown away by their work. Their team is highly skilled and knowledgeable, and they truly transformed my outdoor space into a beautiful oasis."
Concrete
Response time2 hrs
Response rate100%
4 neighbors recently requested a quote
Avatar for C Gibson Paving
C Gibson Paving
5.0(
25
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Raymond, CA and surrounding areas

Approved

In business since 2012

Free estimates

Credit card accepted

"Chris and his tram did an exceptional job demoing and pouring new asphalt for our driveway at our bass lake hime. He has both the expertise and equipment to complete the work. Came on the scheduled day we requested and completed the work in 3 days. I highly recommend them."
Back
Back
Side
Back
Back

+12

Response time1 day
Response rate93%
1 neighbors recently requested a quote
Golden valley Concrete
5.0(
7
)
Concrete Driveways - Install

Serving Raymond, CA and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"Jose and his crew were awesome from start to finish. Very competitive pricing and worked with us on a few things they didn’t have to do. Set post mounts for me in the concrete when they poured. If we have any other concrete we need we will only call them. We have already referred them to family."
2 neighbors recently requested a quote
Recommended by71%of homeowners
...
Showing 1-10 of 52
Asphalt Driveways questions, answered by experts

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

The Raymond, CA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.