Top-rated basement remodelers.

Get matched with top basement remodelers in Northridge, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Northridge, CA?

Select your specific project to find the pro for you.

Find Basement remodelers in Northridge

CA Cabinets, Inc.
5.0(
22
)
Basement - Remodel

Serving Northridge, CA and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Ca cabinets did my complete kitchen remodel David is very professional, extremely knowledgeable and honest. He suggested some great ideas! Ca Cabinets quality of workmanship is impeccable! He kept me within budget and finished on time! I am thrilled with my new kitchen! I very highly recommend Ca Cabinets."
Response time4 hrs
Recommended by94%of homeowners
Avatar for McCormick Home Builders, Inc.
McCormick Home Builders, Inc.
4.7(
42
)
Basement - Remodel

Serving Northridge, CA and surrounding areas

Approved

In business since 2017

Free estimates

Customers say: True professional

"We hired McCormick Home Builders to remodel our living room, and we are beyond pleased with the result. The team was professional, worked efficiently, and Aris design ideas made a huge difference. The room feels so much brighter and more spacious. This was the best decision we made for our home, and we were already planning our next remodel with them."
.
.
.
.
.

+1

Response time6 hrs
Recommended by17%of homeowners
Home Pro Remodeling & Construction, Inc.
4.1(
31
)
Basement - Remodel

Serving Northridge, CA and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"After calling a few companies, we found Home pro remodeling. Ariel the manager gave us a good offer for the retaining wall, it was the best offer we received compare to other companies ! His guys are super professional, nice and clean. We were very happy with the experience. If you are looking to remodel your home , Home pro remodeling is definitely the best in the area! They are the real deal."
Response time5 days
Recommended by77%of homeowners
Avatar for Adar Builders, Inc.
Adar Builders, Inc.
4.5(
62
)
Basement - Remodel

Serving Northridge, CA and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

"I worked with Amit and team last year to remodel my 1970s condo bathroom. They completely gutted my bathroom and replaced everything in less than 2 weeks. When my bathtub was delayed they went out of their way to find one "nearby", was still an hour and a half away. My dad who has been in the tile business for 40+ years said they did an excellent job installing all of the tile. Would highly recommend Adar Builders to anyone!"
Farm House Kitchen
Master Bathroom Remodel
Master Bath Renovation
Major Kitchen Remodel
Major Bathroom Remodel

+696

Response time7 hrs
Response rate99%
Recommended by90%of homeowners
Avatar for Oshri Construction
Oshri Construction
4.3(
6
)
Basement - Remodel

Serving Northridge, CA and surrounding areas

Approved

In business since 1986

Free estimates

Emergency services offered

**Call us today for a FREE ESTIMATE!** With over 30 years of experience, you're going to fall in love with our craftsmanship and design of your project. We specialize in New Construction, Gazebo Building, Custom Home Building, Home Renovation, Construction & Remodeling.

Deck
Kitchen Remodel
Bathroom Remodel
Upscale Bathroom
Guest Bathroom

+99

Response time6 hrs
8 neighbors recently requested a quote
Recommended by75%of homeowners
...
Showing 1-10 of 349
Basement Remodel questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

The Northridge, CA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.