Top-rated basement remodelers.

Get matched with top basement remodelers in Los Alamitos, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Los Alamitos, CA?

Select your specific project to find the pro for you.

Find Basement remodelers in Los Alamitos

Avatar for McCormick Home Builders, Inc.
McCormick Home Builders, Inc.
4.7(
42
)
Basement - Remodel

Serving Los Alamitos, CA and surrounding areas

Approved

In business since 2017

Free estimates

Customers say: True professional

"We hired McCormick Home Builders to remodel our living room, and we are beyond pleased with the result. The team was professional, worked efficiently, and Aris design ideas made a huge difference. The room feels so much brighter and more spacious. This was the best decision we made for our home, and we were already planning our next remodel with them."
.
.
.
.
.

+1

Response time6 hrs
Recommended by17%of homeowners
Home Pro Remodeling & Construction, Inc.
4.1(
31
)
Basement - Remodel

Serving Los Alamitos, CA and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"I had my garden and bathroom remodel done. Albert and Samuel were professional, friendly, and a delight to work with. They're responsive and reliable. I also like the subcontractors whom they used on my project. They kept me informed of everything and I appreciate their excellent work."
Response time5 days
Recommended by77%of homeowners
Avatar for Monroy's Father & Son Construction
Monroy's Father & Son Construction
5.0(
4
)
Basement - Remodel

Serving Los Alamitos, CA and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

"I worked with Daniel and he was very prompt and responsive, did exactly what he said he'd do. He worked underneath the house in an area I couldn't access. Took and showed me pics to illustrate the issues and he worked excellently."
Response time12 hrs
Response rate95%
2 neighbors recently requested a quote
Avatar for Big boys construction
Big boys construction
New to Angi
Basement - Remodel

Serving Los Alamitos, CA and surrounding areas

Approved

Credit card accepted

Hi, my name is Steven with Big Boys Construction. We are a locally owned and operated company serving the High Desert and surrounding areas. We specialize in a wide range of residential services including painting, flooring, drywall, concrete, and general home improvements.\n\nOur goal is simple — deliver quality work, honest pricing, and reliable service you can count on. We take pride in treating every home like it’s our own, with attention to detail and proper preparation from start to finish.\n\nWhether it’s a small repair or a full renovation, we are committed to making the process smooth and stress-free for our customers. We look forward to earning your business and bringing your vision to life.\n

Full kitchen remodel
Vinyl flooring
Vinyl flooring
Vinyl flooring
...
Showing 1-10 of 246
Basement Remodel questions, answered by experts

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Finishing a basement can provide a great return on investment, by increasing the market price of your home when you want to sell. Beyond that, there are many reasons to finish your basement. Doing so expands the usable square footage of your home, so you can enjoy it more, even as your family grows. Renovating your basement costs less in terms of time, energy, and money than having to search for and buy a new home.

The Los Alamitos, CA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.