Top-rated concrete mudjacking pros.

Best concrete mudjacking pros near Mohave Valley, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Mohave Valley, AZ?

Select your specific project to find the pro for you.

Top-Rated Concrete mudjacking pros in Mohave Valley - Updated Nov 2026

Avatar for Jameson Concrete and Bobcat Services
Jameson Concrete and Bobcat Services
New to Angi
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Mohave Valley, AZ and surrounding areas

In business since 2021

Free estimates

Credit card accepted

We pride ourselves on our extreme professionalism and attention to detail. Our customer satisfaction guarantee will assure you we will not leave your property until you are completely satisfied with our work. As a locally owned and operated business you can trust that we will treat your home as we would treat our own. Give us a call today, and we look forward to working with you!

Concrete Mudjacking FAQs, answered by experts

Most houses are expected to settle over time, but foundation sinking of more than a few inches or uneven sinking of more than an inch for every 20 feet is cause for concern. Any significant or uneven sinking should be assessed by a professional to determine the cause and perform any necessary repairs. 

The average cost for mudjacking is around $1,200, though prices can range from $300 to $3,400. On a per-square-foot basis, you can expect to pay between $3 and $8, with an average of about $5 per square foot. The final cost depends on several factors, including the square footage of the concrete, the type of slab, its accessibility, whether it is load-bearing, and the type of material used to lift it. Generally, lifting a driveway, small patio, or sidewalk is less expensive than lifting a slab foundation or garage floor.

A slurry of cement, sand, and water is injected beneath the concrete to lift and stabilize it.

The method involves lifting settled concrete using pressurized cement slurry via drilled holes. This solves uneven surfaces and prevents further settling.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The Mohave Valley, AZ homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.