Top-rated excavation pros.

Get matched with top excavation pros in Happy Jack, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Happy Jack, AZ?

Select your specific project to find the pro for you.

Find Excavation pros in Happy Jack

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business

Serving Happy Jack, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting remodeled both of my bathrooms and installed new flooring throughout my entire house. Thomas was awesome! He was respectful, easy to work with, and offered way better pricing than other contractors I got estimates from, without compromising on quality. The work turned out 10/10, and I?ll definitely be using them again!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

5 neighbors recently requested a quote
Avatar for Ferguson Homes, LLC
Ferguson Homes, LLC
5.0(
2
)
Excavation - Major Grading or Resloping

Serving Happy Jack, AZ and surrounding areas

Approved

In business since 1991

Free estimates

Offers commercial services

"He actually built a house for me. Did a great job and the house was completed in under a year, which is a record for this area. Very responsive to inquires and problems that do come up."
Response time2 days
Response rate100%
2 neighbors recently requested a quote
DB Excavation LLC
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Happy Jack, AZ and surrounding areas

Approved

In business since 2025

Free estimates

Offers commercial services

With over a decade of experience DB Excavation LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service\nwe bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business.

Avatar for Linden Pearce Construction, LLC
Linden Pearce Construction, LLC
New to Angi
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Happy Jack, AZ and surrounding areas

Approved

In business since 2009

Free estimates

Offers commercial services

Linden Pearce Construction LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business. Over 35 years of experience.

Building Pad
Fred Trivet
Fred Trivet
Fred Trivet
Fred Trivet

+7

Response time2 days
Showing 1-10 of 31
Excavating questions, answered by experts

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

As a general rule, the protected area should be about 1½ times as wide as the canopy of the tree’s leaves. This digging measurement can vary by tree species and the age of the tree. Of course, that can be a lot of fencing for larger trees, which is why our first step is about making difficult decisions on which trees to save.

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

The Happy Jack, AZ homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.