Top-rated flooring contractors.

Get matched with top flooring contractors in Royal, AR

Enter your zip and get matched with up to 5 pros

TRUSTED BY ROYAL, AR HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon69
    Verified flooring services reviews

Find Flooring contractors in Royal

Dominguez Flooring
4.6(
59
)
Wood Flooring - Repair or Partially ReplaceLaminate Wood or Stone Flooring - RepairWood Flooring - Repair or Partially Replace- For Business+3 more

Serving Royal, AR and surrounding areas

Approved

Super Service Award Winner

In business since 2002

Free estimates

Warranties offered

"Great working with Dominguez Flooring from start to finish. They're timely, fair, experienced, and committed to doing quality work. I look forward to working with them again!"
Response time12 hrs
Response rate88%
33 neighbors recently requested a quote
TIG Flooring, LLC
5.0(
1
)
Laminate Wood or Stone Flooring - InstallLaminate Wood or Stone Flooring - RepairLaminate Wood or Stone Flooring - Repair- For Business+6 more

Serving Royal, AR and surrounding areas

In business since 1994

Free estimates

Credit card accepted

At TIG Flooring, LLC, we have 20 years of satisfied customers. We take pride in meeting and exceeding your flooring needs. We look forward to serving you. Our resources will help you select the perfect floor covering for your home. References are gladly furnished upon request. Our prices are highly competitive. Be sure to speak with us prior to making your purchase.

Response time1 day
Response rate86%
Avatar for Freewalt Builders Inc
Freewalt Builders Inc
4.6(
61
)
Flooring - Install, Repair, or RefinishLaminate Wood or Stone Flooring - InstallLaminate Wood or Stone Flooring - Install - For Business+9 more

Serving Royal, AR and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"What a project. I live in an OLD late 1800s brick masonry home. The home went through a major gut renovation back in the 70s by a previous owner. Before I bought the place a few years ago, it had sat empty for several years, so several things were in disrepair, and it had sustained some damage due to a leaking roof and such.
Contacted Art during Fall of 2014, with agreement to start the work about mid February 2015. I won't get into estimates vs actual, because in all honesty, once the project started I began having them do stuff that I hadn't originally mentioned during the estimation phase.
Mid february arrived and they were ready to roll, but some delays started happening due to late season snow storms. His crew had to travel from Hot Springs to downtown Little Rock every day. Art was very good about communicating days that he could and couldn't get there.
Jason and Blake were the main tradesmen on the job. They did all demo, framing, flooring, structural support, painting, sanding/staining, mortar tucking, and some tiling. Great to work with. Very trustworthy, respectful, and polite. Gave them keys so they could come and go as needed. Communicated very well and were always reachable. I was able to communicate with them directly so Art didn't always have to be a middle man. They did great work and cleaned up messes every day. This was nice because my fiancee and I were living in the house while all of this was going on.
Josh and John were the main guys working on the bathroom and plumbing. Bathroom layout was completely redone. They laid new plumbing for vanity, toilet, and shower. Custom work on almost all of it. Josh was the tile man...custom tile shower pan and walls, and about 75sqft of floored tile. Josh and John were as equally pleasurable to work with as Jason and Blake. 
All the guys had to suffer through me trying to communicate my end vision, which wasn't always clear. This also involved me changing my mind on things a few times, which also caused them to do some re-work. They were very respectful of this, and all were willing to take things day-by-day as decisions needed to be made.
Of course, a project this big can't go perfectly. Overall, it took a bit longer than anticipated. Some of this was self-inflicted by my adding of work or asking for something to be redone. On Art's side, some delays occurred waiting for certain materials that had to be ordered. Also, I think Art got himself spread pretty thin at some point, so there were some gaps in work time that the guys couldn't show. A few other tradesmen came and went throughout the job to help keep progress going, but sometimes this could lead to a little confusion as to what would be getting worked on each day and who would be responsible for what. At one point Art assigned a new tradesman that spent a few days working at the house solo. I wound up having a couple of issues with this individual. I brought these issues to Art's attention and he immediately took care of them by removing this individual from the job and having some of the individual's work repaired on Art's dime. All other tradesmen I had a good experience with.
Art is old school. Don't expect emails and digital copies of bills / receipts for materials. I never had to pay for anything in advance. He would bill me weekly as work was completed. Because he had so many jobs going on and because my job was not "local" for him, there were a few times where we did not get to connect, which meant that I would have two or more weeks worth of invoices to pay when we would finally get to connect. This could sometimes make it difficult to keep tabs on which guys worked what week and about how many hours they were putting in total from a labor perspective. Could also make it difficult to wade through receipts for materials and match them up with which invoice they were charged on. In the end, I trusted that Art and his guys were being honest and had my best interest in mind, as keeping track of all the expenses and paperwork became too cumbersome at some point. If I ever had questions about an invoice, Art was easy to talk to about it.
In the end, I was very pleased overall, and I will definitely use Art again for some upcoming projects. He's one of the few contractors who will always call you back. The majority of his tradesmen did great work and were a pleasure to deal with. I'm just now getting to move everything back into the remodeled spaces, so I have yet to see how all of the new walls, floors, tile, and bath fixtures hold up with every day use, but I know that Art's a good man and will fix anything that might pop up. So far so good.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by92%of homeowners
...
Showing 1-10 of 71
Flooring Installation questions, answered by experts

Because concrete is porous, installing flooring directly onto the surface is not a good idea. Any moisture within the concrete due to atmospheric conditions or seasonal humidity can seep into your flooring, causing warping or damage. In most cases, you’ll need to install at least a moisture barrier between the concrete and the flooring you choose.

Dust mites feed on dead skin cells, which means your bed is a haven for them. They also like the warmth and humidity in your mattress because that is the climate required for them to survive. That’s why it’s vital to vacuum your mattress and regularly wash your linens to keep mites from living in your bed. 

Carpet glue is very sticky, but it's not permanent. The glue usually lasts as long as a typical carpet installation, which is five to 15 years. For the best results, you should always use the right type of carpet glue for the area you're using it in. There are carpet glues for high-traffic areas, which are more high-quality and durable than others.

Whether you install flooring before or after kitchen cabinets depends primarily on the type of flooring you are using. For materials like hardwood, tile, and sheet flooring, the best practice is to install the flooring first. This ensures the cabinets are installed at the correct height and on a stable surface. However, you should not install cabinets on top of floating floors, such as laminate or luxury vinyl plank (LVP). These types of flooring need room to expand and contract with temperature and humidity changes. Placing heavy cabinets on top can restrict this movement, potentially causing the floor to buckle and making the cabinets unstable. For floating floors, install the cabinets first and then lay the flooring up to them. Other reasons to consider installing cabinets before the flooring include saving money on materials (since you won't need flooring under the cabinets) and avoiding potential damage to your new floor during cabinet installation. Additionally, installing cabinets directly on the subfloor might prevent voiding your flooring's warranty.

You can get away with stretching the carpet with some remaining items of furniture, so long as you have ready access to the parts of the carpet that require maintenance and you are not stretching through the furniture, as this leads to tears and fraying. Try to remove at least 50% of the furniture if you can’t remove it all.

The Royal, AR homeowners’ guide to flooring services

From average costs to expert advice, get all the answers you need to get your job done.