Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Imboden, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Imboden, AR?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Imboden

Avatar for Groundworks
Groundworks
5.0(
4
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Imboden, AR and surrounding areas

Approved (Corporate)

In business since 2000

Free estimates

Warranties offered

"We had the opportunity to meet Bobby Dugger, AND look at our problems and he and partner went straight to work assessing the job , They both were VERY professional and Informative, Explained everything and even found things we knew nothing about, I'm sure we will be PLEASED with the finished work, I would definitely recommend them. Very professional at what he does, THANK YOU GROUND WORKS."
Basement Waterproofing
Basement Waterproofing
Basement Waterproofing
Basement Waterproofing
Concrete

+15

100 neighbors recently requested a quote
Concrete Mudjacking questions, answered by experts

Most houses are expected to settle over time, but foundation sinking of more than a few inches or uneven sinking of more than an inch for every 20 feet is cause for concern. Any significant or uneven sinking should be assessed by a professional to determine the cause and perform any necessary repairs. 

It’s best not to perform mudjacking in the winter unless the ground temperature remains above freezing. Freezing temperatures can cause the slurry to harden too quickly, compromising its strength and longevity. Concrete is also more susceptible to cracking and splitting in cold temperatures, so there’s a higher risk of damaging the slab during the drilling and lifting process in winter.

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Most projects take 1-3 hours, with immediate usability after completion.

The Imboden, AR homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.