Top-rated basement remodelers.

Get matched with top basement remodelers in Harrisburg, AR

Enter your ZIP and get matched with up to 5 pros

Need a pro for your basement remodel project in Harrisburg, AR?

Select your specific project to find the pro for you.

Find Basement remodelers in Harrisburg

Avatar for Greenhead Construction

Greenhead Construction

No reviews yet

Greenhead Construction

No reviews yet
Free onsite estimate

With over 15 combined years of experience, Innovative Home Solutions is your go to company for any of your residential construction/remodeling wants and needs. Our services include trim work, doors, windows, cabinets, appliance installation, plumbing/electric fixture installation, flooring, siding, tile, power washing, custom additions, porches, and MORE! let us be the ones to help on any project you need without breaking the bank.

With over 15 combined years of experience, Innovative Home Solutions is your go to company for any of your residential construction/remodeling wants and needs. Our services include trim work, doors, windows, cabinets, appliance installation, plumbing/electric fixture installation, flooring, siding, tile, power washing, custom additions, porches, and MORE! let us be the ones to help on any project you need without breaking the bank.



All Around The House LLC

5.00(
4
)

All Around The House LLC

5.00(
4
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

We offer free estimates, no upfront costs, and satisfaction guaranteed. We have an AR State Contractor's License, a Paragould Building Contractor's License, and we belong to the Paragould Chamber of Commerce. We do buisness all over NE AR and SE MO. We do a lot of work with insurance claims for water and fire damage, and we will work with your adjuster to get a satisfactory settlement.

We offer free estimates, no upfront costs, and satisfaction guaranteed. We have an AR State Contractor's License, a Paragould Building Contractor's License, and we belong to the Paragould Chamber of Commerce. We do buisness all over NE AR and SE MO. We do a lot of work with insurance claims for water and fire damage, and we will work with your adjuster to get a satisfactory settlement.








LARRY FEE PAINTING & REMODELNG

No reviews yet

LARRY FEE PAINTING & REMODELNG

No reviews yet
Emergency services offered

We have been in business since 1974. We specialize in painting, however we have a broad set of skills including but not limited to Drywall finishing, room additions, trim, flooring, and roofing, power washing, hauling, and much much more. We are licensed and bonded Call us for your free estimate TODAY!!!

We have been in business since 1974. We specialize in painting, however we have a broad set of skills including but not limited to Drywall finishing, room additions, trim, flooring, and roofing, power washing, hauling, and much much more. We are licensed and bonded Call us for your free estimate TODAY!!!

Showing 1-10 of 22
Basement Remodel questions, answered by experts

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Finishing a basement normally takes four to eight weeks, but the timeline depends on the size of your basement, your contractor's availability, and the extent of finishing work. Framing the basement will take three to five days, while adding electrical and rough-in plumbing can be another three to five days. Adding drywall can take five days, and floor installation can take two to three days. Final touches, like painting and adding trim, will take another week.

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

Finishing your basement adds value to your home, providing an average return on investment (ROI) of around 75%. That means the typical basement refinishing costs of $32,000 will add an average of $24,000 to the value of your property. The value added to your home will depend on the price you pay to have the work completed, the area you live in, the quality of the work and building materials, and more.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Harrisburg, AR homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.