"These guys are unbelievable! We had major water issues in our yard and we hired them provided drainage capabilities that would move the water from our yard to the gutter in the street. They not only did an outstanding job, they worked in the rain, thunder, and lightening to get the job done. They solved our problem. We worked with Jake and words can't describe how helpful, courteous, and conscientious he is. There was a lot of excavation involved and they were really efficient, replacing all our sod and then cleaning up after themselves. I would enthusiastically recommend this company."
"They done an amazing job! Got the job done efficiently and it looks amazing now! We couldnt be happier! Would recommend to anyone for anything asphalt-related! Not to mention their customer service was absolutely amazing, very nice people. Great company all the way around!!!"
"Extremely reasonable compared to others helpful funny reliable service. He has installed my water heater, kitchen sink and faucet and now is helping transform my bathroom one section at a time. Ben is the best."
"Wonderful people, a family owned business and you can tell. No automated customer service, just local people. I enjoyed working with them and would do so again."
Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.
While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.
If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:
Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs.
Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.
Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.
If your driveway is cracked, you can repave it with a process called asphalt overlay. Overlay is more cost-effective than a full replacement but is better suited for minor cracks and issues. If you have major cracks or other problems like water pooling, asphalt overlay isn’t your best bet. Plus, paving over a cracked driveway only extends the lifetime by about 10 years, whereas replacing it would start the clock over completely to give you up to 30 years.
DIY is not recommended due to equipment and expertise requirements. Professional services ensure durability and proper grading.
The Chapman, AL homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Learn how to find a top-rated asphalt driveway sealing pro by checking credentials and asking the right questions to ensure your pavement is protected.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.