Top-rated driveway sealcoating pros.

Get matched with top driveway sealcoating pros in Ester, AK

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Ester, AK?

Select your specific project to find the pro for you.

Find Driveway sealcoating pros in Ester

Avatar for Edward's Asphalt
Edward's Asphalt
5.0(
1
)
Asphalt SealingAsphalt Sealing- For Business

Serving Ester, AK and surrounding areas

In business since 1989

Free estimates

Emergency services offered

"It went beautiful. The whole crew was just fantastic, they were so sweet. They told us if we weren't satisfied to let them know and they would come back and do it again. They said they'd keep coming back out until they we were satisfied. They were courteous and friendly, cleaned the driveway first so there was no debris, and protected house from getting asphalt sprayed on it. I would highly recommend them to everyone!"
Recommended by100%of homeowners
Driveway Sealcoating questions, answered by experts

Ideally, you should seal your driveway when there won’t be rain for several days, but at a minimum, there can’t be rain for at least 24 hours. If it rains shortly after you seal your driveway, the water can wash away the sealer and render your work useless. You’ll have to wait for your driveway to dry out and try applying again. Note that some sealers—like oil-based sealers or specialty fast-drying sealers—may cure faster. Ask your contractor for information on timing before the install, and if there’s rain in the forecast, postpone the job.

To maintain your asphalt driveway, add a new coat of sealant every three to five years. Pricing varies, but you will pay about $0.08 to $0.50 per square foot from start to finish. You can also choose to add a fill-and-seal layer that includes a layer of aggregate to fortify a damaged top layer of asphalt.

Access to commercial-grade products and equipment, ensuring thorough coverage and long-lasting protection.

Many services include sealing as part of the repair process. Confirm with your contractor.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Ester, AK homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.