Top-rated basement remodelers.

Get matched with top basement remodelers in Delta Junction, AK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Delta Junction, AK?

Select your specific project to find the pro for you.

Find Basement remodelers in Delta Junction

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Delta Junction, AK and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
BulletProof Construction, LLC
1.0(
4
)
Basement - Remodel

Serving Delta Junction, AK and surrounding areas

In business since 2012

Free estimates

Warranties offered

Bulletproof Construction, LLC, is your premier commercial and residential home service and general contracting firm! From new construction, remodels, additions, kitchens, bathrooms, renovations, roofs, landscape construction, flooring, counter tops and so much more. We can do anything for you. We are a licience, bonded, and insured company that is headquartered in Anchorage and the Mat-Su Valley. Servicing Anchorage, Eagle River, Chugiak, Palmer, Wasilla for smaller projects and the whole state of Alaska for Larger Projects. \n\nWe value Character, Integrity, honesty, and a professional value that is not very common in Alaska. The value of a promise. We are here for you. \n\nWe have done very good work all over the state of Alaska with dozens and dozens of references we can complete all your construction projects.\n\nGive us a call today for a free consultation on your project today!

U.S. Alaska Developments, Inc.
New to Angi
Basement - Remodel

Serving Delta Junction, AK and surrounding areas

In business since 1995

ICBO Repairs (All) \n Repairs Required by Appraisers (All) \n Repairs for Real Estate Agents (All) \n Bathroom and Kitchen Remodel \n Light General Remodel \nRepainting of Existing Homes \nPainting of New Construction \nPre-finish of the following for Contractors, Home Owners, Manufactures and Painters Cabinets \nBathtubs, Sinks, Toilets (Custom Colors) \nMillwork \nDoors (Any Kind)\nMantels, Furniture ETC... \nCustom Coatings \nTub and sink chip repair, factory certified\nMulti Spec finishes\n\n

Basement Remodel questions, answered by experts

Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

Yes. Renovating your basement has a return on investment (ROI) of 75%, meaning your remodel investment will significantly increase the value of your home. Besides the ROI, your family can enjoy a larger, more usable space while you live there. 

The Delta Junction, AK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.