Top-rated rototilling pros.

Get matched with top rototilling pros in Stonewood, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Stonewood, WV?

Select your specific project to find the pro for you.

Find Rototilling pros in Stonewood


CRIDER BOYS CONTRACTING LLC

No reviews yet

CRIDER BOYS CONTRACTING LLC

No reviews yet
25 years of experience

if you need us call the home number -304-278-7825 any time and from 8 am until 4 pm call my cell number 304-276-2925 and if it is an emergency then we will call you back asap just leave a message for us to respond to

if you need us call the home number -304-278-7825 any time and from 8 am until 4 pm call my cell number 304-276-2925 and if it is an emergency then we will call you back asap just leave a message for us to respond to

Rototilling questions, answered by experts

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

You should exercise care when deciding how to landscape over a leach field for your septic system. You typically want lightweight materials that won’t damage the drain field’s perforated pipes. When adding plants to the area, select plants with shallow roots, such as grass or flower gardens. Trees with deep roots could damage the pipes in the field.

Yard grading is a key component of proper drainage because runoff naturally moves with respect to gravity. If you have low spots in your yard, rain and snowmelt will settle there and oversaturate the soil, promoting root rot and fungal growth. If the low spots are near your home’s foundation, you could even end up with foundation leaks or structural damage due to poor yard grading.

Periodic checks for erosion and proper drainage function ensure lasting results.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.