Top-rated contractors.

Get matched with top contractors in Monongah, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Monongah, WV?

Select your specific project to find the pro for you.

Find Contractors in Monongah

Avatar for Eagle Construction LLC
Eagle Construction LLC
5.0(
15
)
Major Home Repairs (General Contractor)

Serving Monongah, WV and surrounding areas

Approved

In business since 2022

Free estimates

Small jobs welcome

"Richard is the absolute best contractor in our area. His work is flawless and heâ s very fast, kind and professional. He remodeled our laundry room and rebuilt our deck. We couldnâ t be happier with his work! Highly recommend!!!"
Response time7 hrs
Response rate99%
4 neighbors recently requested a quote
Avatar for JFV Construction, LLC
JFV Construction, LLC
4.8(
4
)
Major Home Repairs (General Contractor)

Serving Monongah, WV and surrounding areas

Approved

Customers say: True professional

"Very efficient easy to work with and showed up when they said they would. Was very attentive to any of our concerns. Did everything we asked of them. Quality work and professionalism."
Johnson ave
Johnson ave
Johnson ave
Johnson ave
Johnson ave

+19

Response time2 days
Response rate100%
8 neighbors recently requested a quote
Avatar for Muirs General Contracting llc
Muirs General Contracting llc
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Monongah, WV and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Things went smoothly from beginning to end. Very courteous, job done in a timely manner. Employees were very kind and skilled. Mr Muir was very helpful in getting all my projects completed. Would highly recommend him to anyone."
Prep
Deck extension, smoke shack roof build, house rot replaced
Basement remodel
Drop ceiling
Roof replaced + new A frame roof install

+376

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Monongah, WV and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Monongah, WV and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Showing 1-10 of 40
Unfinished Carpentry questions, answered by experts

Duration varies by project size, but average-sized homes typically take a weeks.

A few signs that you need a new door frame include:

  • The door no longer fits properly in its frame and sticks or scrapes.

  • You notice cracks, holes, or rotting.

  • You feel a draft coming from around the door when it’s closed.

  • You find yourself frequently needing to make repairs.

Not all porch columns are load-bearing, though they can be. Some porch columns are simply decorative. There are ways to identify a load-bearing column, like looking for visible seams and a foundation. Also, check to see if the column directly enters the ground. In some porch installations, a contractor will excavate a hole to install a column into the earth along with a buried cement base for stability.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

It’s best to use two screws to secure deck boards into every joist. Securing the boards to every joist makes the deck more structurally sound, while using two screws on the outer sides of the boards can help prevent warping and cupping.

The Monongah, WV homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.