Top-rated rototilling pros.

Get matched with top rototilling pros in Gallipolis Ferry, WV

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Gallipolis Ferry, WV?

Select your specific project to find the pro for you.

Find Rototilling pros in Gallipolis Ferry


CRIDER BOYS CONTRACTING LLC

No reviews yet

CRIDER BOYS CONTRACTING LLC

No reviews yet
25 years of experience

if you need us call the home number -304-278-7825 any time and from 8 am until 4 pm call my cell number 304-276-2925 and if it is an emergency then we will call you back asap just leave a message for us to respond to

if you need us call the home number -304-278-7825 any time and from 8 am until 4 pm call my cell number 304-276-2925 and if it is an emergency then we will call you back asap just leave a message for us to respond to

Rototilling questions, answered by experts

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

Fixing a depression in your lawn is a DIY for small dips, divots, or slight slopes. You can either remove sod and earth to lower the uneven ground or add premixed topsoil and reseed the lawn to raise it. You can also hire a yard grading company near you for professional help.

The average cost to have rototilling done on your property is around $250, and most homeowners pay between $100 and $350. The total for your rototilling project will depend on the area you need tilled, the quality of the soil, how many roots and shrubs are in the area, and the accessibility of the area. Anything that increases the time to till your soil—like hard clay soil, small entrances to the area that require the use of smaller tools, and roots running through the ground—will all increase your costs.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

Improved drainage, garden aesthetics, and protection from moisture damage.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"