Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Chester, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Chester, WV?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Chester

Avatar for TCB Paving LLC
TCB Paving LLC
4.3(
75
)
Asphalt Paving - InstallAsphalt Paving - Install- For Business

Serving Chester, WV and surrounding areas

Approved

Super Service Award Winner

In business since 1989

Free estimates

Warranties offered

"TCB applied asphalt over existing driveway to level dips and irregularities. Richard was prompt in his initial reply, quoted over the phone, and started the job the next day. Crew was personable, efficient, and tidy. Driveway looks nice.."
Asphalt
Paving
Blacktop
A
B

+8

Response time2 days
Response rate87%
65 neighbors recently requested a quote
Avatar for Kline Home Exteriors & Restorations
Kline Home Exteriors & Restorations
4.8(
28
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Chester, WV and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"Excellent Service. Mr. Knox communicated everything up front and was very knowledgeable. He went above and beyond to make sure that my elderly mother's roof was repaired properly. From start to finish I would give him an A+ on all facets of his communication and the company's workmanship. Go with them, you won't be disappointed."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+37

Recommended by96%of homeowners
Showing 1-10 of 31
Asphalt Driveways questions, answered by experts

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The three most common types of asphalt are hot asphalt, MC cold mix, and UPM asphalt. Hot asphalt is used most often for paving and patching roadways while it’s hot and workable. MC cold mix asphalt cures more slowly than hot asphalt, but it can be used for temporary patches and repairs in low-traffic areas. UPM is also used cold, but it can be used as a longer-term fix, usable in almost any conditions at almost any temperature.

Whether you should resurface or replace your asphalt driveway heavily depends on its condition. If the foundation is solid and the damage is minor, resurfacing is your best bet because it’s more affordable and faster than replacing the driveway. But if your driveway has foundational problems and/or severe damage, like large, deep cracks and potholes, then it makes more sense to replace it. 

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

The Chester, WV homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.