Top-rated ceramic tile pros.

Best ceramic tile pros near Chapmanville, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Chapmanville, WV?

Select your specific project to find the pro for you.

Top-Rated Ceramic tile pros in Chapmanville - Updated Nov 2026

Avatar for Machen Home Improvements
Machen Home Improvements
4.0(
77
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Chapmanville, WV and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"We called Machen for an estimate to tear off our old roof on our house and detached garage. They were very responsive and Jodi even came out on a Saturday to give us an estimate. He was very knowledgeable regarding the materials and products we needed, and we were impressed that he actually climbed the roof to take all of the measurements, where other contractors we had contacted did not. The estimate we received was fair considering that the roof deck would need wrapped and the amount of ice guard we needed. Jodi and his team were on time every day and got right to work. They took their time on the job and were very conscientious about the work performed to ensure it was done correctly. Jodi takes a lot of pride in ensuring the job site remains neat and takes a lot of care to ensure they thoroughly clean up before leaving for the day. We ran into heavy rain halfway through the project and Jodi even came out on the weekend to ensure that the roof was water tight before the rain hit. The new roof looks great and we are very pleased with the end result!"
.
.
.
.
.

+117

Recommended by90%of homeowners
Showing 1-10 of 24
Ceramic Tile FAQs, answered by experts

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

If you’re out of spacers for your tile installation, you can use pennies. Each time you place a tile, stick the pennies around the edges (on the sides and the corners). Like working with spacers, you’ll want the same amount of space around each tile before they set.

You cannot tile directly over hot mop waterproofing because tile requires a smooth, solid surface to adhere properly. Additionally, the shower bed pan needs to be raised and sloped toward the drain to prevent water from pooling. However, you can hot mop and apply a sloped mortar bed over the top (to which the tile can then be adhered). 

Uniform spacing between tiles is important for a professional and clean appearance. To achieve this spacing, tile spacers should be placed between the tiles and left in place until the mortar hardens and the tiles are secure. You can use X-shaped spacers vertically in between the tiles and laid flat at the corners.

There are several low-maintenance shower floor tiles to consider for your bathroom. Stone tiles are easy to keep clean and only need an occasional resealing to keep them looking their best. Porcelain is another low-maintenance choice, as it doesn’t stain easily. Vinyl is also suitable for easy upkeep. On the other hand, one of the highest maintenance options for bathrooms is wood tile.

The Chapmanville, WV homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.