Top-rated driveway sealcoating pros.

Get matched with top driveway sealcoating pros in Prentice, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Prentice, WI?

Select your specific project to find the pro for you.

Find Driveway sealcoating pros in Prentice

Hip & Ridge Construction
4.5(
6
)
Asphalt SealingAsphalt Sealing- For Business

Serving Prentice, WI and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"When they were here they worked all day. However there were many days when they had to go to other jobs and that caused delays on our project. Project took much longer than we thought it would. Had a hard time communicating, many times only got voice mail.Seemed to us the contractor had too many jobs going on at the same time. We did not feel our project was a high priority. Overall we are happy with the results but were quite frustrated at times"
Recommended by100%of homeowners
Jensen and Son Asphalt
New to Angi
Asphalt SealingAsphalt Sealing- For Business

Serving Prentice, WI and surrounding areas

Free estimates

Credit card accepted

Offers commercial services

Jensen and Son Asphalt Restoration LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business.

Driveway Sealcoating questions, answered by experts

Yes, they fill all cracks and potholes to ensure a smooth, durable finish that protects the underlying asphalt.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

One of the easiest ways to avoid poor customer service and poor sealant application is to hire a reputable, licensed company. Contact companies with positive customer reviews and Better Business Bureau (BBB) ratings, and ask for customer references from any company you’re considering hiring to seal your driveway. Get price quotes from three local driveway sealcoating companies to compare pricing and services to find the best fit for your home.

If the goal is to reduce your lifetime asphalt driveway repair cost, driveway sealers with oil bases tend to last longer because their composition allows them to penetrate deeper into your driveway's asphalt. This provides deeper, longer-lasting protection compared to water-based products that tend to simply sit on the surface of the asphalt. Knowing that you won't have to redo your driveway as often could leave more room in your budget to cover something like the cost of a heated driveway.

Costs depend on the extent of damage, material costs, labor, and whether resurfacing is needed.

The Prentice, WI homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.