Get matched with top concrete mudjacking pros in Prentice, WI
Top-rated concrete mudjacking pros.

Need a pro for your concrete mudjacking project in Prentice, WI?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Prentice

Avatar for Sure-Dry, LLC
Sure-Dry, LLC
3.8(
18
)

Serving Prentice, WI and surrounding areas

Approved

In business since 1994

Free estimates

Warranties offered

"Mike is great at the planning and cost estimate. He gets right to work and works efficiently, finishing in less time and at a lower cost than I had expected. And he does great work! I now have a well insulated garage, and can't thank Mike enough."
Sump Pump Installation
Waterproofing Basement Walls
Egress Window
Egress Window
Concrete Resurfacing

+18

Response time5 hrs
71 neighbors recently requested a quote
Recommended by60%of homeowners
T.A.P Concrete Masonry, LLC
New to Angi

Serving Prentice, WI and surrounding areas

In business since 2021

Free estimates

Credit card accepted

T.A.P Concrete Masonary is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Costs range from $500 to $1,500, depending on the size and condition of the area.

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

Mudjacking is your best bet for leveling concrete on a tighter budget. It’s less expensive than foam or grout mixture. For smaller, surface-level issues, you could also use a self-leveling compound, which creates an even surface over existing concrete—it’s a budget-friendly option suitable for DIY enthusiasts.

Concrete leveling can last anywhere from five to 10 years or more, and in some cases, it can be a permanent solution. The longevity depends on the method used and whether the underlying cause of the sinking is addressed. For example, mudjacking typically lasts five to 10 years, while polyjacking can last for 20 years or more. It's best to consult a professional for an accurate timeline based on your specific situation and any factors that could cause the issue to recur.

The Prentice, WI homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.