Top-rated subcontractors.

Get matched with top subcontractors in Deer Park, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Deer Park, WI?

Select your specific project to find the pro for you.

TRUSTED BY DEER PARK, WI HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon119
    Verified subcontracting services reviews

Find Subcontractors in Deer Park

Avatar for Wildwood Kitchens and Baths
Wildwood Kitchens and Baths
4.9(
11
)
Major Home Repairs (General Contractor)

Serving Deer Park, WI and surrounding areas

Free estimates

Credit card accepted

"We hired Wildwood Kitchens and Baths to do our kitchen remodel and the experience was excellent. Janel Swanson was absolutely amazing! She is very professional, knowledgeable, and works incredibly fast. We did a full gut renovation of our kitchen, installed new flooring throughout the main level of our home, removed a dining room wall and replaced a window. All of this was completed in 5 weeks. We highly recommend Wildwood Kitchen and Baths."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+58

Recommended by100%of homeowners
Avatar for Haiar Craftsman, LLC
Haiar Craftsman, LLC
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Deer Park, WI and surrounding areas

In business since 2024

Free estimates

Credit card accepted

"I needed a door installed to connect two rooms together and had him frame up a small room. Alex was great to work with. Very professional, positive attitude, fast worker, and he has exceptional interpersonal skills, so it was fun to have him around. He did an excellent job all around."
Bathroom Remodel
Kitchen Remodel
Kitchen Remodel
Kitchen Remodel
Kitchen Backsplash

+3

Response time2 days
Recommended by14%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Deer Park, WI and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Deer Park, WI and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 27
Subcontractors questions, answered by experts

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

It is technically possible to draw your own blueprints, but the process is extremely involved and really demands help from an expert. A professional architect has an understanding of design elements, interior design, the functionality of different rooms in a home, and how everything from furniture, outlets, and light switches should be laid out to serve you and your family best. Hiring an architect for blueprints can get expensive, but it’s the most responsible way to begin a new construction project. If you’re keen on DIYing, you could consider starting the process and then having a professional take over.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

Craftsman houses’ sustained popularity is likely due to their timelessly beautiful design and simplicity. To this day, they hold true to the power of hard work and refined craftsmanship and how that’s all you need to create a beautiful home.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Deer Park, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.