Top-rated welders.

Best welders near Cottage Grove, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your welding project in Cottage Grove, WI?

Select your specific project to find the pro for you.

Top-Rated Welders in Cottage Grove - Updated Nov 2026

Avatar for QUIGLEY DECKS & FENCE
QUIGLEY DECKS & FENCE
4.2(
42
)
Wrought Iron Fence - Repair or Weld

Serving Cottage Grove, WI and surrounding areas

In business since 1985

Emergency services offered

Credit card accepted

"He was very prompt and very professional. At first he thought he would not be able to complete within our requested time frame, but he was able to use a little wiggle room and get it done right on time! Our fence looked so awesome that our neighbors decided to use Quigley too! 
"
Composite decking
Additional Photos
Additional Photos
Additional Photos
Recommended by90%of homeowners
Showing 1-10 of 38
Welding FAQs, answered by experts

Yes, but you’ll need reliable steel-cutting tools and safety gear to get started. Shipping containers are typically around ¾ inch thick, so it’s entirely possible to cut through them, but experience and the right equipment are very important. When possible, try to get a container as close to the size you want it as possible.

Yes, you can cut up a box spring., but you’ll need to do so in layers. You can clear the fabric and fluff away to reveal the springs before removing them as well.

Some welding projects, such as repairing pipes or fences, require travel, whereas others, like furniture repair, do not necessarily require the welder to come to you. Travel and overhead factor into the overall cost of your welding project. Some of the most common welding projects include:

  • Metal furniture repair: $35–$100

  • Pipe repair: $200–$1,000

  • Small gates: $550–$750

  • Fencing: $1,200–$1,800

  • Fabricated sheet metal welding: $750–$2,500

The best thing to cut metal pipe is a durable pipe cutter that is made for metal. You may want to measure the diameter of the pipes before purchasing a pipe cutter to ensure it will be able to cut your metal pipes. Opt for a heavy-duty option to cut through metal like steel or cast iron.

Sawing your hot tub into more manageable chunks so it can be lifted easily into a truck takes several hours. Generally, 2.5 hours for smaller hot tubs and around 4 hours for larger ones with the help of one to two people. If money isn't a concern and you want to skip the physical labor, you can hire a pro to get the job done.

The Cottage Grove, WI homeowners’ guide to welding services

From average costs to expert advice, get all the answers you need to get your job done.