Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Coleman, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Coleman, WI?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Coleman

Avatar for Sure-Dry, LLC
Sure-Dry, LLC
3.8(
18
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Coleman, WI and surrounding areas

Approved

In business since 1994

Free estimates

Warranties offered

"Mike is great at the planning and cost estimate. He gets right to work and works efficiently, finishing in less time and at a lower cost than I had expected. And he does great work! I now have a well insulated garage, and can't thank Mike enough."
Sump Pump Installation
Waterproofing Basement Walls
Egress Window
Egress Window
Concrete Resurfacing

+18

Response time5 hrs
70 neighbors recently requested a quote
Recommended by60%of homeowners
Concrete Mudjacking questions, answered by experts

Mudjacking is suitable for sidewalks, driveways, patios, and nearly all exterior flat structures. However, it may not suit severely damaged or heavily cracked areas.

Mudjacking restores level surfaces, prevents further damage, and is more cost-effective than a full replacement.

Yes, you can mudjack cracked concrete, but the cracks will need to be repaired once the concrete has been leveled. If the concrete is severely cracked in multiple places, replacement may be a better option, but for less severe cracking, mudjacking is a good solution as long as cracks are correctly caulked and sealed.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Most projects take 1-3 hours, with immediate usability after completion.

The Coleman, WI homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.