Top-rated excavation pros.

Get matched with top excavation pros in Boyceville, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Boyceville, WI?

Select your specific project to find the pro for you.

Find Excavation pros in Boyceville

Avatar for Red Cedar Line and Lot Clearing
Red Cedar Line and Lot Clearing
4.9(
4
)
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and Clearing - For Business

Serving Boyceville, WI and surrounding areas

Approved

In business since 1978

Free estimates

Small jobs welcome

"We hired red Cedar lining lot clearing to clear about 2 1/2 acres of heavy brush, and to mulch several 8"-14" trees. It was surprisingly hard to find a company that specializes in brush, clearing and tree mulching. They showed up on time and did a fantastic job. I would hire them again for sure."
Before
After
Response time11 hrs
2 neighbors recently requested a quote
Recommended by100%of homeowners
Tiegs Enterprises
New to Angi
Landscape - Minor Grading or Resloping

Serving Boyceville, WI and surrounding areas

Approved

Hello my name is Jeff Tiegs. I have several years experience hauling various different types of goods and materials. I have a class A cdl with a clean driving record. I currently have a brand new 4ft high sided 14' ft dump trailer that can haul any materails such as wood, shrubs, trees, dirt, gravel, mulch, rock, junk, almost endless oppurtunities. Give me a shout and I can take a look at what you need! Thank you!

Avatar for KithTerra Excavating
KithTerra Excavating
5.0(
2
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Boyceville, WI and surrounding areas

In business since 2025

Free estimates

Credit card accepted

"Customer service was top notch- we started with a 4 acre wooded lot and we had started clearing it ourselves and had many stumps and some more trees to take down. They gave an estimate via photos and email since job site was over an hour away which worked great. Worked til job was finished and did so in a timely manner. We also added clearing a new driveway after the fact and did amazing job. Great communication - would definitely hire again and give referral. Photos are Before and afters."
Spooner land clearing
Spooner land clearing
Clayton land clearing
New Driveway install
New Driveway install

+3

Response time8 hrs
Response rate100%
Showing 1-10 of 41
Excavating questions, answered by experts

Consultation with the local government helps identify necessary permits, avoid project delays or legal issues, and protect project integrity.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

How deep your septic system needs to be into the ground depends on several factors. In extremely cold environments, the tank needs to rest below the maximum frost line, which can be up to six or eight feet deep. The standard burying depth for most systems is between a few inches and four feet below ground level. Depth can also depend on the slope of the landscaping and other property variables. 

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The Boyceville, WI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.