Top-rated contractors.

Get matched with top contractors in your area

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Silvana, wa?

Select your specific project to find the pro for you.

TRUSTED BY SILVANA, wa HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon58
    Verified contractor services reviews

Find Contractors in Silvana

No results for Contractor in

Try adjusting your search criteria.
Unfinished Carpentry questions, answered by experts

House framing can be expensive because the materials are pricey, and the job requires a high level of expertise. The more complex the plans, the more expensive the job, but even the most basic frame needs to be installed with high-quality materials and precision. When pricing your home’s framework, remember that a sturdy frame is necessary to create a safe structure.

When building a house, it is customary to use 16d nails that measure 3 1/2 inches in length to construct the frame. These nails are crucial in providing the necessary support and stability for structural elements like joists and studs, which ensures a sturdy framework.

No, beams are the primary load-bearers for flooring or roofing systems, and they distribute the weight of the structure to your foundational supports, while joists bear far less weight and distribute their loads to the beams. Beams are usually thicker and longer, and they have support posts or foundation walls beneath them for support.

There are a few easy ways to locate a wall stud without a stud finder. First, try knocking on the wall with your knuckles. Most parts of the wall will sound hollow, but when you tap over a stud, it will sound more solid. Alternatively, since studs are spaced 16 or 24 inches apart, you can measure those distances from a corner of the room, which will always have a stud.

You can use a nail to find ceiling joists, but it’s not as reliable as a stud finder, and you’ll end up with lots of small holes in your ceiling. If the nail hits a joist, you'll feel increased resistance. Mark the spot with a pencil. Repeat this process regularly along the ceiling, 16 or 24 inches apart, until you've mapped out the joist locations.

The Silvana, wa homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"