Top-rated pole barn builders.

Best pole barn builders near Langley, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Langley, WA?

Select your specific project to find the pro for you.

TRUSTED BY LANGLEY, WA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon85
    Verified pole barn building services reviews

Top-Rated Pole barn builders in Langley - Updated Nov 2026

Avatar for Grandpa's Truck
Grandpa's Truck
5.0(
1
)
Shed, Barn or Playhouse - Repair

Serving Langley, WA and surrounding areas

Approved

In business since 2011

Customers say: Quick response

Grandpa's Truck Construction, is a solely owned and operated company by Graham T. Martin. A highly skilled craftsman who specializes in various odd jobs such as repairs, maintaining properties and performing renovations and masonry. There is no task too small or too big. Grandpa's Truck allows each home owner to have a custom experience with Graham. Please call or book an online appointment with us! Start as strangers, finish as friends. We are looking forward to making your home improvement project a dream come true!

Bothell Remodel
Matthews Beach Remodel
Deck, Lake City
salon
Bothell Remodel

+324

Response time5 hrs
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Shay's Superior Services
Shay's Superior Services
5.0(
21
)
Shed, Barn or Playhouse - Repair

Serving Langley, WA and surrounding areas

Emergency services offered

"Superior services is exactly what this company is. Great attitude, on time, true to his word. Grand kids were so very excited,"the construction man is here, the construction man is here" is all they could say while waiting for it to be finished. I would like to submit some photos but it appears that I can't."
Handyman Services Project
Handyman Services Project
Handyman Services Project
Handyman Services Project
Handyman Services Project

+206

Response time4 days
Response rate100%
Recommended by100%of homeowners
Avatar for HD Structures LLC
HD Structures LLC
4.2(
34
)
Shed, Barn or Playhouse - Repair

Serving Langley, WA and surrounding areas

In business since 2013

Free estimates

Credit card accepted

"Dan responded almost immediately to my email request for a site visit and was out within a few days to take a look. He made several recommendations and gave me an emailed bid based on the options we discussed. I met with 2 other local contractors (larger construction outfits) and both gave similar prices for the work to be done. We decided to hold off on the job for a few months until our financing was lined up and at that time I reached out to Dan a second time and asked him to come back and meet with both my husband and I to hash out details. He sat down with us and went over everything from lighting to size to color schemes and made recommendations. We agreed on a price, paid a deposit, and he started the permit application process. Our permit process became a huge ordeal thanks to the County and Dan was there every step of the way to make arrangements on our behalf and go to bat with them so we could get the deck we wanted. He measured every single square inch of the deck as he built it with precision and no detail was left untouched. He had to deal with odd weather situations (torrential downpours) and delays due to his supplier (misordered boards). Towards the end we did struggle a bit with getting timely communication from Dan on some final finish work but ultimately we got exactly the deck we paid for and get several compliments on it. In retrospect we should have set out a more concrete timeline as to start and finish of the project as it did take longer than expected. This was likely due to the fact that Dan built nearly every square inch of the deck by himself when we had assumed he had a larger crew."
Hog Panel
Full panel shadow panel
Cumaru with glass railing
Fiberon Castle Grey
Fire pit

+2

Recommended by83%of homeowners
Avatar for D. Stall Home Services
D. Stall Home Services
5.0(
7
)
Shed, Barn or Playhouse - Repair

Serving Langley, WA and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"David showed up when he said he would. He got the work done in a timely fashion and did what he said he was going to do. Very happy with my new floors. They’ve been in for two years now. I have continued to refer him to my friends as he is somebody I can trust."
Deck stair replacement
Deck stair replacement
Deck stair replacement
Deck stair replacement
Deck stair replacement

+17

Recommended by100%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Shed, Barn or Playhouse - BuildShed, Barn or Playhouse - Repair

Serving Langley, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
...
Showing 1-10 of 74
Pole Barn Builders FAQs, answered by experts

Whether you should choose a flat roof or a sloped roof depends on your particular situation. Flat roofs tend to be less expensive to install. However, sloped roofs have longer lifespans and stand up better to heavy snow and other inclement weather.

Keep in mind that even a flat roof needs to have a slight slope, usually around 1/2 inch for every foot. If it is completely flat, water will pool and cause damage, either from weight or leakage or rot.

It may be tempting to DIY the construction of a swing set to save money, but we don’t recommend it. Since children will use the swing set, the entire system must be solid and safe, meaning the cost savings aren’t worth potentially endangering them. Plus, most DIYers will have to build their swing sets out of wood, which won’t last as long as metal or vinyl and introduces the risk of splinters. Instead, hire a local playground equipment installer to ensure the swing set is built safely and efficiently, setting up your kids for fun for years to come.

Yes, barndominiums are energy-efficient as long as insulation professionals properly install quality insulation, windows, and doors. Utility bills for barndo living can be up to 50% lower than those for a traditional home.  Make your barndo more energy efficient by working with contractors and HVAC professionals to strategically place windows, doors, and heating/cooling systems. 

You can use a variety of wood to build a barn door, but the most common options include 1-by boards and 2-by boards for the backing and the decorative boards on the front of the door. Softwoods like pine will save you some money and should hold up well, while hardwoods like maple and oak will stand up to more wear and tear. You could also build the backer out of plywood to minimize the cuts you need to make. Whatever you decide on, make sure the width of the wood is compatible with the mounting brackets you buy.

The construction stage is almost always the longest part of building a house. Within this stage, framing often takes the most time, lasting anywhere from one week to a couple of months, depending on the home's size, the crew, and the time of year. Other parts of the construction phase include pouring the foundation and installing doors, windows, a roof, siding, drywall, and flooring. The planning and design phase can also be very time-consuming, sometimes taking months or even years, especially for a custom home. The final finishing process, which includes painting and installing trim, is typically shorter than the construction or planning stages.

The Langley, WA homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.
    •

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm
    •

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.