Top-rated paving pros.

Get matched with top paving pros in Pittsford, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Pittsford, VT?

Select your specific project to find the pro for you.

Find Paving pros in Pittsford

Avatar for Sullivan Stone, LLC
Sullivan Stone, LLC
5.0(
2
)
Interlocking Pavers for Patios, Walks & Steps - Install

Serving Pittsford, VT and surrounding areas

Approved

In business since 2022

Free estimates

Small jobs welcome

"Mac did an outstanding job replacing our poured concrete sidewalk. He was able to do the work quickly, on budget and the result was outstanding! Mac was great to work with...no problems communicating with him. We wanted to make sure our project was done with minimal impact to our yard and Mac did a great job in that regard. He also cleaned up after the work was done. I would recommend Sullivan Stone (Mac is the owner) without hesitation! We're planning another project for next year and I will definitely reach out to Sullivan Stone to assist us with that as well!"
Retaing wall
Stone steps
Irregular bliestone walkway
Stone water feature
Retaining Wall

+17

Response time3 days
4 neighbors recently requested a quote
Recommended by100%of homeowners
Compete Construction, LLC
New to Angi
Interlocking Pavers for Patios, Walks & Steps - Install

Serving Pittsford, VT and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

We have the experience and we are committed to providing quality workmanship and superior customer service on all our applications. We at Compete Construction strive to maintain our reputation as a high quality, very service oriented company with our main focus being customer satisfaction.\n

Response time2 days
Showing 1-10 of 30
Paving Services questions, answered by experts

An asphalt driveway should be at least 3 inches thick over a compacted gravel base. Areas with poor drainage should have a thicker stone base. To install a new asphalt driveway over an existing driveway, the new asphalt should be at least 2 inches thick and the existing driveway should be in relatively good condition.

If your new pavers look dull or unclean, it is likely due to efflorescence, a chalky, white powder that forms when lime in the pavers gets wet. This condition often resolves on its own, as rain will naturally wash it away within about a year. For faster results, you can use a pressure washer to clean the pavers. Alternatively, consider using cleaning products specifically designed to remove efflorescence or applying sulfuric acid crystals.

There’s no single best asphalt grade—it all comes down to where and how it’s used. Highways and heavy-traffic roads need something tough, like polymer-modified asphalt (PMA) or Stone Matrix Asphalt (SMA). Local roads and parking lots rely on the Performance Graded (PG) system, chosen based on climate. A PG 64-28 mix, for example, handles a broad temperature range while simpler, more cost-effective mixes are typically enough for residential driveways. The best grade of asphalt depends on traffic, weather, and your budget, which is why a professional’s input is always a smart move before making a decision.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Pittsford, VT homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.