Top-rated ceramic tile pros.

Best ceramic tile pros near Clintwood, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Clintwood, VA?

Select your specific project to find the pro for you.

Top-Rated Ceramic tile pros in Clintwood - Updated Nov 2026

Avatar for Welcome Home Builders LLC
Welcome Home Builders LLC
3.2(
9
)
Tile: Ceramic and Porcelain - RepairTile: Ceramic and Porcelain - Repair- For Business

Serving Clintwood, VA and surrounding areas

Approved

In business since 2025

Free estimates

Small jobs welcome

"Jed with Welcome Home Builders did a good job helping us with the project at our church. He built a wall to divide a large room up for us to make a new space. Then the sheet rock, mud, and paint for the new wall all turned out well. Thankful for the help and work he provided to our church. It is much appreciated."
Recent project
Deck remodel
Deck remodel
Deck remodel
Deck remodel

+12

60 neighbors recently requested a quote
Avatar for Walls Construction and Handyman Services, Inc.
Walls Construction and Handyman Services, Inc.
4.4(
16
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Clintwood, VA and surrounding areas

Emergency services offered

Credit card accepted

"After our first contractor left us high and dry, our friends recommended Angie's List.  She told us about how the providers who belong to Angie's List are responsible and professional, so we asked her to give us a name of a handyman and construction service. That is when we were introduced to Walls Construction and Handyman Service.  We contacted them last Friday and their receptionist was very responsive and professional and made us feel at ease and asked if she could send over their field rep that evening due to our circumstance.  Their field rep came over Friday evening after work hours to look at what we needed done and was very professional too.  They allowed us to use our tile we had already purchased.   They showed up Monday morning Oct 8 at 9 AM as promised and completed the job beyond my expectations.  We will be booking future work with them to complete some other projects we have long been waiting for.  Thanks Angie's List. What a great service and thanks Walls Construction and Handy man service. A happy wife is a happy house :)"
Additional Photos
Recommended by86%of homeowners
Avatar for Townside Building and Repair INC
Townside Building and Repair INC
4.2(
13
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Clintwood, VA and surrounding areas

In business since 1997

Free estimates

"Steve was very punctual, showing up early every day. The work didn't exceed the estimate, and he was very good about explaining any needed changes as they came up. His knowledge of construction standards was very helpful and one of the main reasons we chose Townside. The projects listed were not done in a single contract, but over three seperate visits. The fit and finish of all of the projects are second to none. We will definitely use Townside in the future.
"
basemet
Additional Photos
exterior deck, fairfax va.
bathroom renovation
basement finish

+9

Recommended by85%of homeowners
Showing 1-10 of 25
Ceramic Tile FAQs, answered by experts

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

When choosing tiles for a shower floor, avoid highly porous tile materials, like those with a water absorption rating over 7%. Don’t use non-vitreous tiles, or tiles fired at low temperatures, because they will absorb more water. If you use a highly porous tile in the shower, the tiles can wear down faster, meaning they’ll need to be replaced much sooner.

The tile spacing you should use will depend on the tile and where you’re installing it. Choosing the right tile spacers to maintain a consistent gap between your tiles is tricky. Generally, tile spacing shouldn’t be less than 2 millimeters on walls and 3 millimeters on floors because of stress relief requirements. Getting it wrong can result in uneven tiles and early repairs.

No, you don’t technically need a cement backer board for a wall tiling project, but not using it risks disastrous moisture damage. Cement is naturally water-resistant, whereas drywall soaks it in, which can lead to warping or mold growth. Always use a backer board treated with a waterproof membrane for bathrooms and other chronically damp areas to ensure complete tile shower waterproofing.

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

The Clintwood, VA homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.