"There was just some miscommunication. I thought they were only giving me a quote, however, MD believed otherwise. I ended up going with someone else, but still needed help.About a week later, I called Derrick and Sara back for another quote. However, when Derrick returned to my house, I was humbled very quickly. And at the end of it all, a bit disappointed. he made me feel terrible for choosing someone else first, and then told me he needed money to be paid upfront. I ended up paying $225 to have MD Enterprise mow my neighbors front and back yard. As terrible as this sounds, I feel ashamed of where I live. It's not even my property, but I paid to have it mowed. I waited one day, and the next evening, I had to sweep the debris off the driveway and the sidewalk myself. And MY part of the yard, well, they clearly just missed the assignment. Again, I'm not angry, just disappointed."
"They were awesome. I had an oddball sized garage door and they were able to locate and install a new one, add a lift motor, replace all of the channeling and add an outside entry keypad. Now I'm able to park the cars inside once again. "
"Omar and his team did a phenomenal job installing a stair rail. He was professional and the job was completed in one day. Rail looks really nice and itâ s sturdy. Thank you Boss Tex welding."
Industrial Asphalt has a single mission: complete customer satisfaction! We strongly believe in giving our customers the most for their money. We work with only the highest quality materials and experienced professionals. With over 25 years of experience, we have consistently focused on the needs of our customers, providing personalized attention and a stress free experience. This approach has set us apart from our competition and keeps our customers coming back! Give us a call today!
New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.
During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.
The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.
Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.
A solid driveway starts with the right asphalt mix, and for most homes, dense-graded hot mix asphalt (HMA) is the most recommended. It’s both durable and flexible, making it a reliable choice for residential use. A properly compacted 2-3 inch layer on a well-prepared crushed stone base will hold up for years. In areas with harsh winters or scorching summers, a slightly modified mix can help prevent cracking and rutting. No matter the climate, quality installation is just as important as the material itself, so hiring an experienced contractor ensures a smooth, long-lasting driveway built to last.
Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.
In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.
The Gruver, TX homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.