Top-rated subcontractors.

Get matched with top subcontractors in Fritch, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Fritch, TX?

Select your specific project to find the pro for you.

TRUSTED BY FRITCH, TX HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon59
    Verified subcontracting services reviews

Find Subcontractors in Fritch

Avatar for The Basement Kings
The Basement Kings
4.8(
16
)
Major Home Repairs (General Contractor)

Serving Fritch, TX and surrounding areas

In business since 2004

Emergency services offered

Credit card accepted

"The basement king was a pleasure to work with. His knowledge is unmatched in the Texas area for sure. I received multiple quotes and talked to multiple companies and he was the best. He's passionate about his work and the manner in which it's done. If he says something, it happens. An added benefit was their cleanliness. Usually a job site of this size and complexity is a mess, but not with the basement kings. 10/10!"
Recommended by92%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Fritch, TX and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Fritch, TX and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for BTL Woodworking - Home  Facebook
BTL Woodworking - Home Facebook
5.0(
2
)
Major Home Repairs (General Contractor)

Serving Fritch, TX and surrounding areas

In business since 2017

Free estimates

"Very trustworthy, even when you are not in your home! He is very good about cleaning up his messes, daily. He does not leave anything out. Very dependable. Amazing price for the quality of work! -Lacy"
Kitchen 5
Kitchen 4
Kitchen 3
Kitchen 2
Kitchen 1

+24

Response time12 hrs
Recommended by100%of homeowners
Avatar for Ventura's Drywall
Ventura's Drywall
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Fritch, TX and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"Went very well came at 6 o'clock in the morning finished in one day did a wonderful job. Replaced the entire ceiling and one bathroom and redid a wall in another that had water damage on the roof leak also replaced rotted studs in wall and remove tub.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+26

Recommended by100%of homeowners
Showing 1-10 of 33
Subcontractors questions, answered by experts

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

Building designers charge between $2,000 and $50,000, depending on project scope, complexity, and customization.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.

The Fritch, TX homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.