Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Decatur, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Decatur, TN?

Select your specific project to find the pro for you.

TRUSTED BY DECATUR, TN HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon15
    Verified ceramic tile services reviews

Find Ceramic tile pros in Decatur

Avatar for Bakers building solutions
Bakers building solutions
New to Angi

Serving Decatur, TN and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

Hi, I’m Brandan Baker, owner of Baker Building Solutions. I specialize in high-quality residential construction and remodeling services, including kitchen and bathroom remodels, flooring, tile work, trim, custom shelving, cabinetry, framing, siding, window and door installation, and more.\n\nI take pride in delivering reliable workmanship, honest communication, and attention to detail on every project — from small repairs to full custom builds. My goal is to provide quality work you can trust while helping homeowners bring their vision to life.

Shower remodel
Shower remodel
Living room addition
Living room addition
Floating shelves

+3

5 neighbors recently requested a quote
Avatar for Elite Grout Chattanooga LLC
Elite Grout Chattanooga LLC
5.0(
4
)

Serving Decatur, TN and surrounding areas

In business since 2025

Free estimates

Warranties offered

"Did an absolutely stunning job the grout should last a long while and I?m very happy with the speed and professionalism. Along with the price that outweighs other local companies for the longer lasting grout."
Shower Restoration
Shower Restoration
Shower Restoration
Shower Restoration
Response time7 hrs
Response rate93%
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Decatur, TN and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Decatur, TN and surrounding areas

In business since 2006

Credit card accepted

"Excellent - I ended up hiring someone to help with shopping and finishing piece - waste of time and money. Jill's service was by far the most useful and best value in my decorating process.
"
Recommended by55%of homeowners
Creasman Ceramics
New to Angi

Serving Decatur, TN and surrounding areas

In business since 2000

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality and customer service that we provide to meet the consumers' needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety and quality, regardless of how large or small the job.

...
Showing 1-10 of 62
Ceramic Tile questions, answered by experts

It’s best to install a shower door after the bathroom tile is in place to ensure you have accurate measurements. If you try installing a shower door first, the tile might be too thick to install afterward, or the tile will be too thin and create a gap between the shower doors that allows water to leak. With the tile in place first, you’ll know the exact shower door size that you need.

The average cost for tile installation is about $2,000, with a typical price range between $500 and $6,500. On a per-square-foot basis, you can expect to pay between $5 and $45 for installation.

Several factors influence the total cost, including:

  • Installation Site: Costs vary for different areas. Common project costs are: kitchen floor ($870–$6,100), countertop or backsplash ($500–$3,000), bathroom floor ($300–$2,400), or shower wall ($225–$2,000).

  • Tile Type and Quality: The material significantly impacts price. For example, standard ceramic or travertine tile can cost about $1 per square foot, while luxury options like marble can be as much as $350 per square foot for the material alone.

  • Project Size and Complexity: The total square footage, the complexity of the pattern, and the shape of the tile (e.g., square, rectangle, hexagon, mosaic) will affect labor and material costs.

  • Site Preparation: The amount of prep work needed, such as removing old tile or installing a new subfloor or backer board, can add to the final price.

  • Tile Characteristics: The tile's durability rating and porosity can also influence the price.

  • Location: Labor rates vary by geographic location.

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

The rule tells you how to cut tile to install it in a corner. The 3/4/5 rule recommends that you should have 3 feet across on one straight line, four feet on the other perpendicular line, and 5 feet of length from the end of one of the lines to the other. You’re making a right triangle with the tile, and the hypotenuse (the line across from where the 3-foot lie and 4-foot line meet) should be 5 feet long.

If you’re out of spacers for your tile installation, you can use pennies. Each time you place a tile, stick the pennies around the edges (on the sides and the corners). Like working with spacers, you’ll want the same amount of space around each tile before they set.

The Decatur, TN homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.