Top-rated roofers.

Best roofers near Woonsocket, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your roofing project in Woonsocket, SD?

Select your specific project to find the pro for you.

Top-Rated Roofers in Woonsocket - Updated Nov 2026

Avatar for 1-800-HANSONS (Sioux Falls Exteriors)
1-800-HANSONS (Sioux Falls Exteriors)
4.0(
665
)
Asphalt Shingle Roofing - Install or ReplaceMetal Roofing - Install or Replace

Serving Woonsocket, SD and surrounding areas

Approved (Corporate)

In business since 1988

Free estimates

Credit card accepted

Our number one priority is to serve our customers by anticipating their needs and exceeding their expectations. We do what it takes, every day, to make Hanson's Window and Construction, Inc., the best place for our family to serve yours.

photos
photos
photos
photos
photos

+16

10 neighbors recently requested a quote
Recommended by86%of homeowners
That 1 Guy Roofing & Repair
New to Angi
Asphalt Shingle Roofing - Install or ReplaceAsphalt Shingle Roofing - Repair

Serving Woonsocket, SD and surrounding areas

Approved

In business since 2024

Free estimates

That 1 Guy Roofing & Repair is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business. \n

Response time10 mins
Renaissance Roofing, Inc.
2.8(
51
)
Natural Slate Roofing - RepairNatural Slate Roofing - Repair- For BusinessTraditional Tile Roofing - Repair+1 more

Serving Woonsocket, SD and surrounding areas

In business since 1992

Credit card accepted

"i am seeking other quotes and I feel like 10,000 to just add ventilation to the attic with out having to cut in the roof is to much. I was expecting $5000,00 maybe even 6000,00 but the quote was above what i expected to spend this year. if i get the same quotes from other contractors i will wait until next year so that i can be prepared to pay the cost in full. i do not want to go with wells fargo only to pay interest on top of the 10,000."
Photo
Photo
Tru-Slate Roof System
Tru-Slate Roof System
Tile Roof Restoration

+3

Response time2 days
Recommended by93%of homeowners
Showing 1-10 of 30
Roofing FAQs, answered by experts

The easiest way to tell if your roof vent boot is leaking is to look in your attic for signs of water damage. You might see visible moisture, water spots, or mold on the roof decking around the roof vent or damaged or soggy insulation below it. If you don’t have access to your attic or aren’t sure if the vent boot is the issue, hire a professional to come inspect your roof and figure out the underlying issue.

Tar and gravel roofs last an average of 30 years, which is longer than the average lifespan of many other flat roofs. The gravel on top of the waterproof membrane helps protect the roof from UV damage and physical damage, so if you keep your roof drains clear and carry out annual roof inspections to catch issues early, you could see up to 40 years of useful life from your roof.

A roof replacement will usually include removal of your old roof, shingle replacement, and a new roof underlayment, but it may only include adding new shingles if you’re layering new shingles over the old shingles. If you have signs of roof leaks or your roofer finds water damage to the roof decking underneath your old roof, it can also include replacement of the OSB or plywood decking that lays over your rafters and supports the roofing material above.

Asphalt shingles have varying thicknesses across the length, so failing to stagger shingles from one row to the next will leave you with bulges and bumps if the thicker sections stack on top of each other. Not only is this unappealing, but it increases the risk of water intrusion. Stagger each new row by 6 inches to avoid this issue.

Framing a roof can take from several days to a week or more, depending on the size and complexity of the roof, the number of people working on the framing, weather conditions, and more. Roof framing is often the final step of framing a house, although in some cases, the roof may be framed before the interior of the home in order to offer more protection from the elements.

The Woonsocket, SD homeowners’ guide to roofing services

From average costs to expert advice, get all the answers you need to get your job done.