Get matched with top contractors in Gayville, SD
Top-rated contractors.

Need a pro for your contractor service project in Gayville, SD?

Select your specific project to find the pro for you.

Find Contractors in Gayville

Avatar for JWM Construction LLC
JWM Construction LLC
5.0(
5
)

Serving Gayville, SD and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"Replaced doors, windows, trim, sheetrock and siding. Excellent customer service skills. All were very polite and made sure everything was how we wanted it before they started in. The products and work as well as creativity to enhance everything to be long lasting strong as well as a professional finished look."
New deck build
New deck build
New deck build
New deck build
New deck build

+21

Response time3 days
Response rate89%
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Gayville, SD and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Gayville, SD and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Hampton Enterprise LLC
Hampton Enterprise LLC
3.7(
9
)

Serving Gayville, SD and surrounding areas

In business since 1989

Free estimates

Emergency services offered

"I only use James when I need some work done to my house. He responds fast, gets the work done quicker than just about anyone else I've ever used and seems very concerned with leaving his customers happy."
Additional Photos
Additional Photos
Recommended by60%of homeowners
Avatar for JP Contracting LLC
JP Contracting LLC
3.0(
2
)

Serving Gayville, SD and surrounding areas

In business since 2021

Free estimates

Credit card accepted

JP Contracting is a newly formed company with the principles in the business having over 20 years experience in the construction industry. We got tired of being the point of contact for our customers and keeping secrets we do everything open book. \n\nWe specialize in new home construction, large and small remodels (I.e. kitchen, bath, home additions) \n\nWe take care of everything from local permitting to material acquisition to completion. Keeping the client informed along the way.

Recommended by100%of homeowners
Showing 1-10 of 18
Unfinished Carpentry questions, answered by experts

Baseboards don’t have to be nailed into studs. However, nailing them into studs adds to their stability. When studs aren’t available, you can secure them with drywall nails directly into the drywall and adhesive. Always aim to nail into studs, especially in high-traffic or impact-prone areas.

New builds, remodels, and additions often necessitate professional framing expertise.

Installing an ornamental or decorative porch column takes around three to five hours. Structural columns take longer because your pro has to install a jack to hold up the roof while switching the column out. If there's any structural damage, it can add several days to the timeline to repair the damage.

Yes, professionals can install new frames, trim, and threshold adjustments for a complete finish.

Framing a house with steel generally takes less time—around five to eight weeks—than most building materials. The steel components can also be made quickly off-site and manufactured with pre-punched holes for running piping and electrical wiring, which will lessen the prep work and extra labor during construction.

The Gayville, SD homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.