Top-rated basement remodelers.

Get matched with top basement remodelers in Williamsburg, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Williamsburg, PA?

Select your specific project to find the pro for you.

TRUSTED BY WILLIAMSBURG, PA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon11
    Verified basement remodels reviews

Find Basement remodelers in Williamsburg

Avatar for Rough Diamonds Construction LLC
Rough Diamonds Construction LLC
5.0(
14
)

Serving Williamsburg, PA and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"I had a very pleasant experience with Rough Diamonds Construction. Nate (owner) was always available for questions. The basement remodel was done well and timely."
My jobs
My jobs
My jobs
My jobs
My jobs

+8

Response time11 hrs
Response rate90%
1 neighbors recently requested a quote
Avatar for Rovenolt Contracting
Rovenolt Contracting
New to Angi

Serving Williamsburg, PA and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

Rovenolt Contracting is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.\n\n+8 Years of Experience\n

Response time6 hrs
Response rate97%
3 neighbors recently requested a quote
Avatar for M and S Seamless Gutter
M and S Seamless Gutter
4.7(
73
)

Serving Williamsburg, PA and surrounding areas

In business since 2018

Free estimates

Warranties offered

"They did a great job! Easy communication and quick scheduling. Replaced all of our gutters and installed a new section for us that we did not previously have on our back porch. Couldnâ t be happier with the quality and service. Friendly and efficient."
replacing gutter on front of house
log cabin
log cabin
log cabin
Hip around

+2

Response time1 day
Recommended by96%of homeowners
Avatar for Central Lending Svc Inc dba Credit Central
Central Lending Svc Inc dba Credit Central
4.8(
72
)

Serving Williamsburg, PA and surrounding areas

In business since 2003

Emergency services offered

"I can't thank Mark enough for being a voice of reason who stepped in to help us deal with a tricky situation.
He is a straight forward, smart guy who cares about his clients. And that's not to say he doesn't care about the bottom line, too. He got us the best rate out of the three lenders we spoke with, and he made sure we understood exactly what we our options were.
He is extremely responsive and quick -  and you cannot underestimate the degree to which hustle can matter in housing transactions. He's an all-around gem, so glad we found him.
"
Additional Photos
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Williamsburg, PA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Eco Builder Services Co
Eco Builder Services Co
3.9(
46
)

Serving Williamsburg, PA and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"House was properly resupported and while digging for supports Gino noticed a larger water problem then originally thought. Additional sump pump and pit was suggested with extra drains prior to pouring concrete. I agreed and am glad I did. Pouring of concrete is complete. It's a large basement and as expected the concrete has a few spots that pool water. Gino has assured me that these spots will be leveled with a special concrete leveled in order to assure proper drainage in the event of water. Overall the sump pump system works well as it was tested with a large rainstorm.
"
Recommended by64%of homeowners
Showing 1-10 of 39
Basement Remodel questions, answered by experts

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

The Williamsburg, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.