Top-rated basement remodelers.

Get matched with top basement remodelers in Warrior Run, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Warrior Run, PA?

Select your specific project to find the pro for you.

Find Basement remodelers in Warrior Run

Avatar for Borrell Construction Service, LLC
Borrell Construction Service, LLC
2.7(
38
)
Basement - Remodel

Serving Warrior Run, PA and surrounding areas

Approved

In business since 1998

Free estimates

Credit card accepted

"They showed up every day and worked the entire day. Very courteous and friendly. They were accommodating and wanted to please. I am very very pleased with their service and would use them again. They remodeled two bathrooms and did a wonderful job!"
Walk In Safety Shower
Siding and Windows
Before
Before
Before

+95

Response time2 days
Recommended by94%of homeowners
Avatar for Kingston Flooring
Kingston Flooring
4.7(
22
)
Basement - Remodel

Serving Warrior Run, PA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"They remodeled my kitchen, installed flooring in all rooms in the house. They installed new windows through the whole house. They worked on my deck and also my garage. I can’t say enough good things very professional and timely."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

1 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Optima Construction, LLC
Optima Construction, LLC
5.0(
13
)
Basement - Remodel

Serving Warrior Run, PA and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"I hired Luzerne Renovations to replace old wood paneling walls and an old drop in grid style ceiling with drywall. A ceiling light/fan was also installed. I am very happy with the work that was done! Chris was very professional and maintained great communication each step of the way. I was given options to pick from during the estimate process, which I greatly appreciated. And then when I wasnâ t available to be there when they finished, he texted me photos so I could see the final product. The attention to detail was fantastic. They thoroughly cleaned up each day. When they installed the drywall, they also made sure to position the outlets in much better spots (from right at floor level to ~1 foot above the floor). The room looks a million times better! Overall, I highly recommend Luzerne Renovations and am planning to hire them again in the future."
Kitchen Renovation
Kitchen Renovation
Kitchen Renovation
Basement
Basement

+39

Response time20 mins
Response rate98%
Recommended by100%of homeowners
...
Showing 1-10 of 93
Basement Remodel questions, answered by experts

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

The Warrior Run, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.