Top-rated basement remodelers.

Get matched with top basement remodelers in Warrior Run, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Warrior Run, PA?

Select your specific project to find the pro for you.

Find Basement remodelers in Warrior Run

Avatar for Borrell Construction Service, LLC
Borrell Construction Service, LLC
2.7(
38
)
Basement - Remodel

Serving Warrior Run, PA and surrounding areas

Approved

In business since 1998

Free estimates

Credit card accepted

"They showed up every day and worked the entire day. Very courteous and friendly. They were accommodating and wanted to please. I am very very pleased with their service and would use them again. They remodeled two bathrooms and did a wonderful job!"
Walk In Safety Shower
Siding and Windows
Before
Before
Before

+95

Response time2 days
Recommended by94%of homeowners
Avatar for Kingston Flooring
Kingston Flooring
4.7(
22
)
Basement - Remodel

Serving Warrior Run, PA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"They remodeled my kitchen, installed flooring in all rooms in the house. They installed new windows through the whole house. They worked on my deck and also my garage. I can’t say enough good things very professional and timely."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

1 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Optima Construction, LLC
Optima Construction, LLC
5.0(
13
)
Basement - Remodel

Serving Warrior Run, PA and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"I hired Luzerne Renovations to replace old wood paneling walls and an old drop in grid style ceiling with drywall. A ceiling light/fan was also installed. I am very happy with the work that was done! Chris was very professional and maintained great communication each step of the way. I was given options to pick from during the estimate process, which I greatly appreciated. And then when I wasnâ t available to be there when they finished, he texted me photos so I could see the final product. The attention to detail was fantastic. They thoroughly cleaned up each day. When they installed the drywall, they also made sure to position the outlets in much better spots (from right at floor level to ~1 foot above the floor). The room looks a million times better! Overall, I highly recommend Luzerne Renovations and am planning to hire them again in the future."
Kitchen Renovation
Kitchen Renovation
Kitchen Renovation
Basement
Basement

+39

Response time20 mins
Response rate98%
Recommended by100%of homeowners
...
Showing 1-10 of 93
Basement Remodel questions, answered by experts

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Warrior Run, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.