Top-rated home builders.

Best home builders near Orange, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Orange, PA?

Select your specific project to find the pro for you.

TRUSTED BY ORANGE, PA HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon10
    Verified home building services reviews

Top-Rated Home builders in Orange - Updated Nov 2026

Avatar for A.S.B. Renovation Design & Build LLC
A.S.B. Renovation Design & Build LLC
5.0(
5
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Orange, PA and surrounding areas

Approved

Super Service Award Winner

In business since 2017

Free estimates

Warranties offered

"I am very happy with how everything turned out. Everything was done in a timely fashon and within our budget. Their communication was amazing. They talked me through the prosses to make sure I understood everything that was going on. I love their attention to detail. The tile work was amazing. I just love our new bathroom. Im thinking we'll deffinatly have them back when we do our kitchen next."
Additional Photos
Additional Photos
New Build
Additional Photos
Additional Photos

+21

14 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Lee's Custom Carpentry, LLC
Lee's Custom Carpentry, LLC
4.2(
8
)
Shelter or Outbuilding - Build

Serving Orange, PA and surrounding areas

Approved

In business since 2018

Free estimates

Small jobs welcome

"They showed up on time, removed the old roof with no damage to shrubbery, patio or pond. Very satisfied with the final result and cleanup. I will be calling Barnes and Lee Construction for my next project."
Setting of the Post
Setting of Headers
Setting of Headers
Rough Framing
Rough Framing

+36

Response time4 hrs
Recommended by100%of homeowners
Avatar for Thomas Kitchens Inc
Thomas Kitchens Inc
4.9(
37
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Orange, PA and surrounding areas

In business since 1960

Free estimates

"The whole process was detailed and well done. This was in a new home construction and Curt took the time to make sure the vision I had was brought to life. He custom designed the medicine cabinet in the master bathroom. Had our countertops and vanities set at the height we requested. The only issue I had was some lack of communication to let me know when there were issues getting the one bathroom vanity and letting me know timing of when someone would be coming to do the installations. Other then that the we overall are pleased with the work done."
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Recommended by100%of homeowners
Avatar for Central Lending Svc Inc dba Credit Central
Central Lending Svc Inc dba Credit Central
4.8(
72
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Orange, PA and surrounding areas

In business since 2003

Emergency services offered

"I knew it was going to be challenging to find an investor that would lend me money for this real estate venture.  I have lived 20 years in a four unit historic condominium building in downtown Jersey City and I wanted to buy the unit above me as an investment property.  But with Fanny Mae and Freddy Mac rules, they would not give me a loan because I would own half the building and this would give me too much control over condo association decisions.  I checked with Angie's List where Central Lending was well recommended and spoke with Mark, the president of Central Lending, about my situation and that I needed an unconventional loan outside of Fanny Mae and Freddy Mac oversights.  After many disappointments and on the very last day of my contract with the seller, Mark found a lender.  And on the very last day of the window to the loan, it closed.  I cannot thank Mark and his assistant Judy enough for their patience and steadfast of seeing this through.  I cannot tell you the emotional roller-coaster ride I went through during the 4 1/2 month duration.  There were many moments that I wanted to give up but Mark reassured me that the sale would happen.  Without Mark's personal intervention with the lender and title company, this deal would not have closed.   You can be sure that when I am in the market to buy unit #3, I will not hesitate to contact Central Lending.  Thank you so much."
Additional Photos
Recommended by100%of homeowners
Avatar for All Phase Construction
All Phase Construction
5.0(
3
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Orange, PA and surrounding areas

In business since 2011

Free estimates

Emergency services offered

General Repairs, Roofing, Masonry, Drywall/Spackeling, Concrete, Carpentry, Property Maintenance, we do metal roofs, shingle, rubber, all type of shakes etc. Parging chimneys, brick, block stuck etc. And all General Construction and repairs.. No job to big or to small!! in business since 2011 Family owned and operated. We Garunteed All of our work and Quality is Top Notch! Give us a call well get your home looking beautiful again! GARUNTEED LOWEST PRICES!!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Avatar for Eco Builder Services Co
Eco Builder Services Co
3.9(
46
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Orange, PA and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"
  • Met with Gino early June. Original contact with him (he called) was 3 hours after my email on a Sunday! Met with him several times going over what we wanted, gave him architectural drawings of the deck and discussed materials to be used. We had some concerns over attaching such a large structure to the house and wanted to be sure we would have no problems with it shifting or collapsing and to make sure the weight bearing was addressed with all posts etc. He was great to deal with, able to reach easily and quick to sign the contracts and pick up the deposit. I called 3 references, all glowing. All stated Gino's men worked from 7:00am to 7:00pm and finished the jobs in the assigned time and quality of work was excellent. 2 were repeat customers and some even referred him to their friends and actually he was on those additional jobs then. Sounded GREAT!
  • Contracts signed 6-22-12
Promised start date 7-16-12 and quoted a 10-14 day job. The only item not included in our original plans was the railing. We changed our minds and added the railing to the bid on 7-17-12 and paid for supplies and labor for this addition in full. Not once did Gino mention this may cause an extension on the original 10-14 day job time.
Promised start date delayed a week to 7-23-12. No one showed up. We had to call him to see what was going on! He then promised they would be there on 7-25-12, no one showed. FINALLY they showed up on 7-28-12. He offered NO explanation at that time.  
His employees would not show up for days with no explanation. Weather was cooperative. I found the prIncipal problem to be inexperienced employees with little to no supervision, they seem unsure as to what to do. Some errors in work were so obvious I noticed them! All issues we pointed out were corrected promptly.   
Here is a timeline of the work done using my dated photographs as a reference so as to be fair and accurate: 
July 28th-siding removed (3/4 of the back of my home is exposed to the elements). Holes being dug for sonna tubes. (note-they did have to dig in bedrock and actually needed jackhammers for a few of them).
August 3rd-sonna tubes in. 3 long beams in for the base of the deck (extending to the back from the house).
August 7th-framing has been done for the second time. First time they had such a bow in it that a foreman ripped it out and redid it in a day! 
August 13th-started roof beam frame. 
August 15th-roof frame complete.
August 20th-shingles on the roof complete-more siding removed.
August 22-face of the roof completed. (triangle part now solid)
August 25th-face of the roof now has scalloped siding 
August 28th-inside of roof framed for soffit.
August 30th-2 of the 3 columns up, 14 X 22 section of decking almost complete.
August 31st-all decking down, 3 columns done- still no siding on my house. We have been having major water damage to the interior of our home due to heavy rainfall and no siding. Spoke with GIno about our concerns but still no finish date set.
September 7th-railing 3/4 done, still missing siding and steps. 
September 13th railing complete, still needs soffit work and gutters. Siding now beginning to be being replaced but it has been almost 2 months without siding!
September 21st-soffit work completed. Siding is on and has been cleaned with a pressure washer.  Finally able to place my recently purchased furniture (June) onto my deck. Still needs lattice work completed but at least now I can sit on my deck (in a jacket!) Just in time to put the furniture away for the winter!
October 3rd-lattice work complete. Deck finally finished.
 To sum up my experience with Gino and ECO Builder Services:
 The end result was a beautiful deck. He always returned our calls even when he knew we were upset or angry. 
  
What I did not like
The time promised for the job (10-14 days) did not equal the time it took to finish the job! (82 total days/60 work days if you count Monday to Friday).
 When I addressed this with Gino I was met with rude comments, him hiding behind 2 separate contracts of 10-14 days , plus the add on contract (for items he neglected to include in the original bid!) 5-7 days and stating the times listed for each job were consecutive.  While I understand weather may play a part in missing some days here and there, I can assure you that the weather was the least of it. Lack of appropriate workers on site was always the problem.
 
I did not appreciate being bumped for more "important" clients and being the subject of his poor time management skills. Spending $19,000 on a deck and not being able to use it for an entire year is not what I had in mind back in mid JUNE.


"
Recommended by64%of homeowners
Avatar for Northeastern Roof Restoration
Northeastern Roof Restoration
4.4(
23
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Orange, PA and surrounding areas

Free estimates

Credit card accepted

"Jeremy and Donny were excellent. They finished the job in the allotted time. They were easy to talk with during the project. We've now got the biggest deck on our entire street. My neighbor even hired them on the spot to put a staircase on his deck. By the time they left, we developed an amazing relationship. We already have them coming back for another massive project in our home. Definitely one of the best crews I've ever seen work together and definitely a great hiring choice"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+138

Recommended by86%of homeowners
Showing 1-10 of 29
Home Building FAQs, answered by experts

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

A-frame homes are on the smaller side. While there’s no set square footage amount it has to be, it will usually come in around 1,000 square feet or smaller.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Historically, Tudor homes originally stemmed from the 15th and 16th centuries, while Victorians appeared during Queen Victoria's reign in the 19th century. The design and structural differences are significant as well. The many types of Victorian architecture—such as Italianate architecture—typically feature ornate trim, wood siding, wraparound porches, and tall towers on top, such as belvederes. On the other hand, Tudor-style homes feature white stucco exteriors with exposed wooden rafters marking the house frame both inside and out.

The Orange, PA homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.